My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-21-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
03/21/1994
>
8.1. SR 03-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:29 AM
Creation date
8/3/2006 1:00:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CONSliLTING ENGINEERS <br /> <br />CIVil ENGINEERING <br /> <br />ENVIRONMENT Ai <br /> <br />MUNICIPAl <br /> <br />PLANNING <br /> <br />ST.RUCTURAI <br /> <br />_RVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORTATION <br /> <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612-644-4389 <br />Fax: 612-644-9446 <br /> <br />/fIIjOO Shelard Parkway <br />~nneapolis, MN 55441 <br />612-546-0432 <br />Fax: 612-544-6398 <br /> <br />AGENDA ITEM 8.1. <br /> <br />March 18, 1994 <br />File: 230-151- 20 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: INTERIM WWTP IMPROVEMENT <br /> <br />Dear Council Members: <br /> <br />As directed by the City Council in August 1993, we have proceeded with an interim plan for <br />the upgrading of the wastewater treatment plant. As you recall, this interim plan was <br />necessitated by the failure of one of the main treatment facilities at the existing plant. The <br />interim plan consists of constructing a trickling filter unit which is part of the planned major <br />upgrading of the treatment plant. This construction will eliminate the concern regarding the <br />failed treatment facility and will also slightly increase the capacity of the treatment plant. <br />The estimated construction cost of these improvements is $1,000,000, which will result in <br />a similar reduction in the cost of the major plant upgrading scheduled for 1995/1996. <br /> <br />The plans for this interim improvement have been completed, and reviewed and approved <br />by the Minnesota Pollution Control Agency. We are therefore ready to proceed with the <br />bidding and construction of these improvements. Attached for the City Council's <br />consideration is a draft resolution which approves the plans and specifications and authorizes <br />the advertisement for bids. We would recommend that the City Council adopt the resolution <br />to proceed upgrading of the wastewater treatment plant. <br /> <br />If you have any questions, I will be in attendance at Monday evening's meeting. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />~%~ <br /> <br />Terry J. Maurer, P. E. <br /> <br />TJM:tp <br />Attachment <br /> <br />230/151-1804.mar <br />
The URL can be used to link to this page
Your browser does not support the video tag.