Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />COMMUNITY <br /> <br />1 ) <br /> <br />OTSEGO <br /> <br />2 ) <br /> <br />Rl>.MSEY <br /> <br />3) <br /> <br />HAM LAKE <br /> <br />4 ) <br /> <br />ANDOVER <br /> <br />Ace. SORY BUILDING SU~YiliRY <br /> <br />ACCESSORY BUILDING SIZE <br /> <br />LOT SIZE <br /> <br />1,000 Sq ft <br />1,000-1,500 Sq ft* <br />1,500 Sq ft and larger ** <br /> <br />-ANY <br />-ANY <br />-ANY <br /> <br />* Administrative Permit <br />** Only through C.U.P. <br /> <br />-Pole Buildings only allowed in A-1 & A-2 <br />through a C.U.P. <br /> <br />624 Sq ft <br />800 Sq ft <br />1,200 Sq ft <br />1,600 Sq ft <br />1,600 Sq ft <br />2.000 Sq ft <br />2,400 Sq ft <br />2,400 Sq ft <br />2,800 Sq ft <br />3,200 Sq ft <br />4,000 Sq ft <br />4,400 Sq ft <br />4,800 Sq ft <br /> <br />1 acre or less <br />1 to 2.5 acres <br />2.5 acres <br />2.6 acres <br />3.0 acres <br />3.5 acres <br />3.6 acres <br />5.0 acres <br />5.6 acres <br />6.6 acres <br />8.6 acres <br />9.6 acres <br />10.6+ acres <br /> <br />* On parcels of land less than 2-1/2 acres <br />in size, accessory structures must be <br />built with the same type of construction <br />materials used on the home. <br /> <br />676 Sq ft <br />800 Sq ft <br />1,200 Sq ft <br />-Discretionary with <br />Council approval <br /> <br />Under 2.5 acres <br />2.5 to 5 acres <br />5 to 10 acres <br />10+ acres <br /> <br />* For lots less than five acres building <br />materials must match existing house. <br /> <br />** An administrative permit approved by <br />staff can exceed the size requirements. <br />Exterior construction materials provide <br />that a list of stipulations are met. . <br /> <br />75% of the land cover of <br />the principal structure <br /> <br />Less than 1 <br />acre <br /> <br />Shall not exceed the total <br />Sq ft of land cover of the <br />principal building. <br /> <br />1 to 5 acres <br /> <br />* No pole buildings on parcels 3 acres in <br />size or less. <br />