My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 03-07-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
03/07/1994
>
5.2. SR 03-07-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:28 AM
Creation date
8/3/2006 12:46:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/7/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />. <br /> <br />71720 <br /> <br />representative in writing of those defects. Any recommendations made <br />by the city are not binding on the state. The state shall have the <br />exclusive right to determine whether the City cost participation <br />construction covered under this agreement has been satisfactorily <br />performed by the state's contractor. <br /> <br />ARTICLE III - BASIS OF PAYMENT BY THE CITY <br />section A. SCHEDULE "I" and EXHIBIT "Cost ParticiDation" <br />A Preliminary SCHEDULE "I" is attached hereto and made a part hereof <br />by reference. The preliminary SCHEDULE "I" includes all anticipated <br />City cost participation construction items and the construction <br />engineering cost share covered under this agreement, and is based on <br />engineer's estimated unit prices. <br /> <br />EXHIBIT "Cost Participation", a colored layout which shows all <br />anticipated City cost participation construction covered under this <br />agreement, is on file in the office of the State's Division Engineer <br />and in the office of the State's Municipal Agreements Engineer at <br />st. Paul, and is made a part hereof by reference with the same force <br />and effect as though fully set forth herein. <br /> <br />section B. city Cost ParticiDation construction <br />The City shall, at the percentage indicated, participate in the <br />following construction to be performed upon, along and adjacent to <br />Trunk Highway No. 101 at the junction of Trunk Highway No. 10 within <br />the corporate City limits under State Project No. 8608-14 <br />(T.H. 101=187). The construction includes the city's proportionate <br />share of item costs for mobilization, field office and traffic <br />control. <br /> <br />84.0 Percent shall be the rate of cost participation in all of the <br />mainline storm sewer construction as shown and/or described in <br />"orange" on EXHIBIT "Cost Participation", which is on file at the <br />locations given in section A. of this article. The construction <br />includes, but is not limited to, those construction items as <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.