Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />71720 <br /> <br />Section B. Maintenance by the City <br />Upon satisfactory completion of the Trunk Highway No. 10 East <br />Frontage Road construction to be performed within the corporate City <br />limits under the construction contract, the City shall provide for <br />the proper maintenance of the roadway and all of the facilities a <br />part thereof, without cost or expense to the state. Maintenance <br />shall include, but not be limited to, snow and debris removal, <br />resurfacing and/or seal coating and any other maintenance activities <br />necessary to perpetuate the roadway in a safe and usable condition. <br /> <br />Upon satisfactory completion of the concrete walk construction to be <br />performed between the Trunk Highway No. 10 East Frontage Road and <br />Retaining Wall A within the corporate City limits under the <br />construction contract, the City shall provide for the proper <br />maintenance of the concrete walk without cost or expense to the <br />state. <br /> <br />section C. Additional Drainaqe <br />Neither party to this agreement shall drain any additional drainage <br />into the storm sewer facilities to be constructed under the <br />construction contract, that was not included in the drainage for <br />which the storm sewer facilities were designed without first <br />obtaining permission to do so from the other party. The drainage <br />areas served by the storm sewer facilities constructed under the <br />construction contract are shown in a drainage area map, EXHIBIT <br />"Drainage Area", which is on file in the office of the state's <br />Division Hydraulics Engineer at Golden Valley and is made a part <br />hereof by reference with the same force and effect as though fully <br />set forth herein. <br /> <br />Section D. Future Res~onsibilities <br />upon satisfactory completion of the Trunk Highway No. 10 East <br />Frontage Road construction to be performed within the corporate City <br />limits under the construction contract, the City shall thereafter <br />accept full and total responsibility and all Obligations and <br /> <br />7 <br />