My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1.D. SR 02-21-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
02/21/1994 - SPECIAL
>
3.1.D. SR 02-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:28 AM
Creation date
7/24/2006 2:51:05 PM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />Mr. Pat Klaers <br />January 24, 1994 <br />Page Three <br /> <br />Easements and Permits <br /> <br />The existing right-of-way along TH 10 varies in width from 190 feet to 240 feet. This right-of- <br />way appears to be adequate to construct the turn lane improvements. No additional permanent <br />easement is anticipated as being required. Fill material and sodding will be needed behind the <br />new concrete curb to match the existing boulevard. If necessary, permission would be secured <br />from abutting property owners should work need to be done to match private property. The <br />width of the area affected by construction would be determined during the design process. <br /> <br />The only permit necessary for the turn lane improvements would be from MnDOT for work <br />within their right-of-way. This permit would require bonds and insurance documentation from <br />the Contractor performing the work. <br /> <br />Financing <br /> <br />As discussed earlier in this study, a condition of the extension of the conditional use permit was <br />that Mr. Beaudry waive any objections to assessment for the improvement. It is therefore <br />understood that all project costs associated with the work shall be ultimately funded by Mr. <br />Beaudry . <br /> <br />e <br /> <br />Project Schedule <br /> <br />The following schedule could be met for the right turn lane improvements: <br /> <br />Receive feasibility study and order public hearing <br /> <br />Hold public hearing and order project and <br />and plans and specifications <br /> <br />Approve plans and specifications and advertise for bids <br /> <br />Open bids <br /> <br />Receive bids, establish amount to be assessed, and set <br />assessment hearing date <br /> <br />Hold assessment hearing <br /> <br />A ward contract <br /> <br />Begin construction <br /> <br />Complete construction <br /> <br />e <br /> <br />202-1004.dec <br /> <br />February 7, 1994 <br /> <br />March 7, 1994 <br /> <br />March 28, 1994 <br /> <br />April 13, 1994 <br /> April 18, 1994 <br /> <br />May 1994 <br />May 1994 <br />June 1994 <br />July 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.