Laserfiche WebLink
<br />e <br /> <br />18. The Permittee represents and warrants to the City that <br />the Facility shall at all times comply with the <br />performance standards descriptions and representations <br />made in the Permittee's application for a Solid Waste <br />Facility License to permit the operation of a Waste <br />Burning Facility and in the correspondence from <br />permittee to John Klovning dated January 23, 1987, and <br />with all applicable city, county, state, and federal <br />laws and regulations, including without limitation, <br />environmental laws and regulations. <br /> <br />19. The establishment and operation of the facility shall at <br />all times fully comply with the terms and requirements <br />of this Permit and with the terms, requirements and <br />conditions of Section 604 of the City Code and the Solid <br />Waste Facility License issued by the City for the <br />Facility, including any requirements and conditions of <br />said Section 604 and/or said license which are not <br />specifically set forth in this Permit. <br /> <br />e <br /> <br />20. All Ash shall be permanently transported out of the City <br />except that portion, if any, which is attributable to <br />solid waste provided to the Facility by Sherburne <br />County, unless otherwise approved by the City and <br />Sherburne County. Ash and residue disposal shall <br />strictly comply with the requirements of Section 604 of <br />the City Code and the requirements of Chapter 7035 of <br />Minnesota Rules. Ash deposited in the state of <br />Minnesota shall only be permanently deposited in solid <br />waste management facilities which have been specifically <br />designed for Ash disposal; which have been approved by <br />the Minnesota Pollution Control Agency for Ash disposal; <br />and which are equipped with a liner and leachate <br />collection system adequate to collect all leachate which <br />may be generated at the Site. <br /> <br />21. Responsibility for Costs: <br /> <br />A. The Permittee shall pay all direct costs incurred <br />by it or the City in conjunction with the <br />application for this Permit and the development, <br />operation, and regulation of the Facility, <br />including without limitation legal, planning, <br />consulting, engineering, and inspection expenses <br />(including a reasonable charge for City staff time) <br />incurred in connection with approval of the <br />Facility, the preparation of this Permit, and all <br />costs and expenses incurred by the City in <br />monitoring and inspecting the construction and <br />operation of the Facility, except those costs and <br />expenses normally covered by the building permit <br />fee. <br /> <br />e <br /> <br />4. <br />