Laserfiche WebLink
<br /> <br />retention tank so that it does not enter the groundwater <br />system. No RDF or Residue trucks may be washed at the <br />~ Burn Facility. <br /> <br />13. The Processing Facility shall be enclosed by a minimum <br />six-foot and no more than eight-foot high chain link <br />fence. <br /> <br />14. The Processing Facility shall undertake no processing of <br />MSW until all appropriate items in this Permit and the <br />building permit are completed and finally inspected by <br />the City of Elk River Zoning Administrator and a written <br />certificate of occupancy has been issued. <br /> <br />15. Permittee shall test storm water run-off captured in the <br />on-site retention/detention pond, and shall provide <br />written reports on these test results to the City, as <br />provided in the rain water run-off sampling plan <br />submitted by Permittee. If the required tests indicate <br />water quality problems in rain water run-off, Permittee <br />shall submit to the City for approval a plan for <br />addressing such problems and shall implement such <br />solutions as are required by City. <br /> <br />e <br /> <br />16. The Permittee shall engage in a regular and routine <br />litter maintenance and removal program extending <br />(a) one-half mile east of the Processing Facility <br />entrance on 165th Street Northwest, (b) southeast on <br />Highway 10 from the intersection of 165th Street <br />Northwest with Highway 10 to the eastern city limits, <br />(c) northwest on Highway 10 from said intersection to <br />the intersection of Highway 10 and Highway 169, and <br />(d) any other areas adversely impacted by debris related <br />to Facility operations as may be determined by the City. <br />Litter shall be removed from these areas no less than <br />once per week, and more often if necessary because of <br />spills or complaints from neighboring property owners, <br />to ensure that these areas are kept free of litter <br />generated by truck traffic traveling to and from the <br />Facility. In addition, Permittee shall inspect all <br />trucks leaving the plant to ensure that they are either <br />fully enclosed or covered, and/or clean, and will not <br />spread litter on surrounding streets and roadways as <br />they leave. <br /> <br />~ <br /> <br />17. The Permittee shall immediately pay to reimburse the <br />City for any and all expenses associated with initial <br />Processing Facility-related improvements on 165th Street <br />from the Processing Facility entrance to the <br />intersection with Highway 10, and on any other city <br />streets used by vehicles transporting RDF or Residue <br />which may serve as primary access for the Burn Facility. <br />For the foregoing street, the Permittee shall also <br />reimburse the City for all patching and repair expenses <br /> <br />5 . <br />