My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 01-18-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
01/18/1994 - SPECIAL
>
7.1. SR 01-18-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:26 AM
Creation date
7/21/2006 3:17:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/18/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />System, and Permit for the Construction and <br />Operation of a Waste Processing Facility, No. SW- <br />305 (collectively referred to as the MPCA Permit), <br />issued by the Minnesota Pollution Control Agency <br />(MPCA) . <br /> <br />II. This License is issued subject to the requirements and <br />conditions set forth below in Section III, which are imposed <br />for the purposes of: <br /> <br />1. Satisfying the standards set forth in the Elk River <br />City Code of Ordinances, including Section 604 and <br />Article IX thereof; <br /> <br />2. Promoting compatibility with and minimizing any <br />potential adverse effects upon prop~rties and <br />neighborhoods adjacent to the Facility or within <br />the City; <br /> <br />3. Protecting the public health, safety, and general <br />welfare; <br /> <br />4. Avoiding traffic congestion or hazard; and <br /> <br />5. Preventing land, water, or air pollution. <br /> <br />III. Requirements and Conditions: <br /> <br />1. <br /> <br />Incorporation of Plans and Application Materials. <br />Construction and operation of the Facility shall be in <br />accordance with the plans and other materials submitted <br />by Licensee to the City and the MPCA, including those <br />identified above in Section I of this License, all of <br />which are hereby made a part of this License. <br />Construction or operation in violation of any of the <br />material statements of fact, factual information, or <br />representations made by the Licensee to the City or MPCA <br />shall be deemed to be a violation of this license. <br /> <br />2. Submission of Final Plans. Final plans and <br />specifications for the Facility must be reviewed and <br />approved by City staff and/or consultants prior to the <br />issuance of a building permit for the Facility. <br /> <br />3. <br /> <br />Incorporation of MPCA Permit and Regulations. The terms <br />and conditions of the MPCA permit and all MPCA <br />Regulations applicable to the Facility are specifically <br />incorporated into this License and the Licensee shall <br />comply with all such terms and conditions including, <br />without limitation, the "Operating Conditions," "Special <br />Operating Requirements," and "General Conditions" of the <br />MPCA permit and that portion of the MPCA Permit denoted <br />"Permit No. SW-305." Any violation of the MPCA permit <br />or any MPCA Regulation will constitute a violation of <br /> <br />2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.