My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6.A. SR 01-18-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
01/18/1994 - SPECIAL
>
5.6.A. SR 01-18-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:26 AM
Creation date
7/20/2006 3:11:31 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/18/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />....,-"~-,._.....~ <br /> <br />~~.-.._,_;c__._.. <br /> <br />,.~ <br /> <br />INSTRUCTOR <br /> <br />RAYMOND SEBASTIAN, Assistant Chief, Building Official <br />and Chief Mechanical Inspector for Clermont County Build- <br />ing Department; 15 years' experience in mechanical con- <br />tracting and construction followed by 12 years of building <br />code administration; Bachelor of Science Degree in Engi- <br />neering and Technology and further training in special <br />equipment and services; Serves on the Education Testing <br />Services (ETS) Committee at Princeton University; Pres- <br />ently serving as Committee Chairman for the Mechanical <br />Advisory Committee of the National Certification Program <br />for Construction Code Inspectors; also a member of the <br />BOCA National Mechanical Committee; Batavia, Ohio. <br /> <br />3:00 Refreshments <br /> <br />3:20 Fundamental System Design <br />· Basic Load Calculations (Manual J) <br />. Establishing an Air Balance Schedule <br />~ Effects of Positive and Negative Pressure <br /> <br />5:15 Social Hour <br /> <br />6:15 Dinner <br />The Wisconsin Center <br /> <br />TUESDAY, FEBRUARY 1, 1994 <br /> <br />A.M. <br />8:30 Heating and Cooling Equipment <br />· Residential <br />· Commercial <br /> <br />PROGRAM <br /> <br />MONDAY, JANUARY 31,1994 <br /> <br />A.M. <br />8:00 Registration . <br />The Wisconsin Center <br />702 Langdon Street <br />Madison, Wisconsin <br /> <br />10:00 Coffee and Conversation <br /> <br />10:30 Heating and Cooling Equipment-continued <br />· Plan Review <br />· Field Inspection <br /> <br />8:35 Welcome and Introduction <br />Philip M. Bennett <br />Program Director <br /> <br />8:45 Discussion of Weeks Activities <br />· Presentations <br />· Demonstrations <br />· Problem Solving <br />· Assignments <br /> <br />12:00 LUNCH <br /> <br />P.M. <br />1 :00 Air Duct Systems <br />· Materials <br />· Supports <br />· Controls <br />· Protection of Fire Ratings <br />~ Fire Dampers <br />~ Firestopping <br /> <br />9:15 Codes Interpretation & Implementation <br />· Standards vs. Codes <br />· Interpretation <br />· Decision Making <br /> <br />2:45 Refreshments <br /> <br />3:00 Air Duct Systems-continued <br />· Plan Review <br />· Field Inspection <br /> <br />10:00 Coffee and Conversation <br /> <br />10:30 Mechanical Codes <br />· Introduction <br />· Purpose and Scope <br />· Code Arrangement <br />· Referencing Content <br /> <br />4:30 Adjourn <br /> <br />11 :15 SeUing Up a Mechanical Inspection Program <br /> <br />WEDNESDAY, FEBRUARY 2, 1994 <br /> <br />A.M. <br />8:30 Fuel Supply Systems <br />· Fuel Oil <br />~ Tank Installation <br />~ Piping (Materials and Methods) <br />~ Safety Precautions and Tests <br />· Fuel Gas (Natural and LPG) <br />~ Tank Installation (LPG) <br />~ Piping (Materials and Methods) <br /> <br />12:00 LUNCH <br /> <br />/ <br /> <br />P.M. <br />1 :00 Mechanical Definitions <br /> <br />2:30 Symbols and Calculations <br />· SMACNA Symbols <br />· ASH RAE Symbols <br />· Basic Calculations <br /> <br />10:00 Coffee and Conversation <br /> <br />38 <br /> <br />39 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.