My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1.0. SR 01-08-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
01/08/1994 - SPECIAL
>
1.0. SR 01-08-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:25 AM
Creation date
7/20/2006 2:44:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/8/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />e <br /> <br />. <br /> <br />PROJECT SCHEDULE AND PROBABLE COST <br />WASTEWATER TREATMENT PLANT EXPANSION <br />CITY OF ELK RIVER <br /> <br />MSA, CONSULTING ENGINEERS <br />JANUARY, 1994 <br /> <br />I. Interim Plan (1.04 MGD) <br />Submit Plans & Specs to MPCA <br />Advertise for Bid <br />Bid Open <br />Construction Begins <br />Substantial Completion <br />Final Completion <br /> <br />Date <br />1/7/94 <br />217/94 <br />317/94 <br />3/21/94 <br />10/15/94 <br />11/15/94 <br /> <br />Construction Cost <br />Overhead and Administration (28 %) <br />Total <br /> <br />Cost <br />$1,000,000 <br />280.000 <br />$1,280,000 <br /> <br />II. Plant Expansion (2.2 MGD) <br />Submit Plans & Specs to the MPCA <br />MPCA Review with Comments <br />Submit Revised Plans & Specs to the MPCA <br />Plans & Specs Ready for Bidding <br /> <br />Date <br />June, 1994 <br />Oct, 1994 <br />Jan, 1995 <br />Mar, 1995 <br /> <br />Construction Cost <br />Overhead and Administration (28 %) <br />Total <br /> <br />Cost <br />$3,633,000 <br />1.017.000 <br />$4,650,000 <br /> <br />III. Addition of Tertiary Filters <br />(Lower the pollutant concentrations in order to maintain mass loadings) <br /> <br />_ Monitor mass loadings vs. flow rate to determine when and if filters will be needed. <br /> <br />Probable time if filters are needed. <br /> <br />Date <br />2005-2015 <br /> <br />Construction Cost <br />Overhead and Administration (28 %) <br />Total <br /> <br />Cost <br />(1994 dollar~) <br />$730,000 <br />204.000 <br />$934,000 <br /> <br />151-0506.jan <br />
The URL can be used to link to this page
Your browser does not support the video tag.