Laserfiche WebLink
<br />requirement of 5/1000 for the service aspect (sales/ sen-rice) of the business, and 2/1000 for the <br />cleaning portion of tlle business (general industrial). This would require 6 parking spaces. <br /> <br />landsccping <br /> <br />No changes are proposed to tlle landscaping plan as approved as part of the site plan. <br /> <br />Gradinc, Drainage and Utilities <br /> <br />No changes are proposed to tlle grading and utilities serving the property. <br /> <br />Standards for Issuance of a Conditional Use Permit (Section 30-6541 <br />TIle issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: <br /> <br />1. lVil1 not endangel~ ilf/ure or detrllJlental/y affect the use and el!jq)JJJJent of other property in the llJJJJlediate <br />vicinity or the public health, safe!)', JJJorals, COJJifort, convenience or general lve!fare of the neighborhood or the <br />ciry. <br />A dry cleaning establislnnent is not an uncommon senrice use in a retail location. The <br />expansion does not appear to negati'Tely impact the surrounding area. <br /> <br />2. tf:7ill be consistent with the conJjJrehensive plan. <br />TIle Comprehensive Plan guides the existing use at public/semi-public. The City may "\vish <br />to consider a cllange in tlle Comprehensi\re plan in the future, however, the need for tlle <br />Comprellensi\re Plan '\vas triggered by the rezoning, not the proposed use. <br /> <br />3. r.vrill not iJJpede the n017JJal and orderly developlJJent and llJprOVelJJellt of surrounding vacant properry. <br />Other than adjacent tenant spaces and the restaurant, there is no surrounding 'vacant <br />property. The establishment "\vould be consistent with other businesses providing services to <br />the neighborhood. <br /> <br />4. Will be Se17Jed adequate!;' 0./ and Jvill not adverse!;' afftct essential public facilities and services including <br />streets, police and fire protection, drainage, refuse disposa~ water and selver !)lsteJJJs, parks and schools; and <br />i.vil/not, in palticulaJ~ create traffic congestion or inteiference with traffic 011 aef/acent and neighboring public <br />thoroughfares. <br />The operation is not expected to create a traffic demand of significant ,rolume. <br /> <br />5. lVil1 not involve tlses, activities, processes, JJJaterials, eqllip1Jlent and cOllditions of operation that lvill be <br />detliJIJental to aIry persons or property because of excessive traffic, noise, sJJJoke, filJJJes, glare, odors, dust or <br />vibratio llS. <br />After speaking with dle applicant, there is not expected to be any impact on adjacent <br />properties, including noise and odors. TIle applicant has stated that all \vastes are handled <br />internally. <br /> <br />6. Lt7illllot result ill the des!l7lctiol1, loss or daJJlage of a J1atllltl~ scenic or historic feature of lJJeyor ilJpoltance. <br />To staff's kno\vledge, there are no natural features in danger due to the illy cleaning <br />business. <br /> <br />S:\PLfu'JNING\Case Files\2006\CUP\CU 06-17 Natures Dry Cleaning\Staff report 06-17.doc <br />