My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 12-20-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
12/20/1993
>
7.3. SR 12-20-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:22 AM
Creation date
7/5/2006 2:30:14 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/20/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CONSULTING ENGINEERS <br /> <br />ClV/1 ENGINEERING. <br /> <br />ENVIRONMENTAL <br /> <br />MUNICIPAL <br /> <br />PlANNING <br /> <br />STRUCTURAl <br /> <br />_URVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORT A nON <br /> <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612-644-4389 <br />Fax: 612-644-9446 <br /> <br />.800 Shelard Parkway <br />Minneapolis, MN 55441 <br /> <br />612-546-0432 <br />Fax: 612-544-6398 <br /> <br />December 15, 1993 <br />File: 230-152-10 <br /> <br />Mr. Steve Ach <br />City Planner <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: ELK PARK CENTER FEASIBILITY STUDY <br /> <br />Dear Mr. Ach: <br /> <br />At their December 20th meeting, City Council will be considering a resolution approving <br />the conditional use permit for the proposed Elk Park Center development. It would be <br />appropriate for the City Council to also consider a resolution formally authorizing the <br />preparation of the feasibility study. The work we have done to date as authorized by <br />motion of the City Council. As such, it does not represent the formal authorization of a <br />feasibility study. I have attached a draft resolution for the City Council's consideration. <br /> <br />The feasibility study will not only deal with the issues already presented at the December <br />13th meeting, but also sanitary sewer, water, and internal street improvements, along with <br />cost, funding scenarios, and timing relative to the phasing of the Elk Park Center <br />development. <br /> <br />If you have any questions regarding this, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />&t!~ <br /> <br />TJM:tp <br />Attachment <br /> <br />152-1508.dec <br />
The URL can be used to link to this page
Your browser does not support the video tag.