My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. SR 11-15-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
11/22/1993
>
7.0. SR 11-15-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:22 AM
Creation date
6/30/2006 2:55:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/15/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />Steve Ach, City Planner <br />November 18, 1993 <br />Page Three <br /> <br />5. Analyze the alternative drainage plan which calls for significantly more on- <br />site storage and all drainage flowing to the south with no drainage flowing <br />under TH 169 to the east. <br /> <br />The above listing of critical items attempts to identify those items which we would <br />concentrate our efforts on between now and the December 13th public hearing. Obviously, <br />the final feasibility study will cover many, many more items, such as sanitary sewer, water, <br />and street infrastructure to serve the site. Also, a critical part of the feasibility study will <br />be cost estimates on the various improvements needed and a funding scenario for those <br />costs. <br /> <br />TJM:tp <br /> <br />e <br /> <br />e <br /> <br />152-1805.noY <br />
The URL can be used to link to this page
Your browser does not support the video tag.