Laserfiche WebLink
<br /> <br />CONSULTING ENGI~'EERS <br /> <br />CIVil ENGINEERING: <br /> <br />ENVIRONMENTAl <br /> <br />MUNICIPAl <br /> <br />PlANNING <br /> <br />STRUCTURAl <br /> <br /> <br />-SURVEYING <br /> <br />TRAFFIC <br /> <br />T,~ANSPORTATlON <br /> <br />1326 Energy Park Drive <br />51. Paul, MN 55108 <br />612-644-4389 <br />Fax: 612-644-9446 <br /> <br />_ 9800 Shelard Parkway <br />Minneapolis, MN 55441 <br />612-546-0432 <br />Fax: 612-544-6398 <br /> <br />ITEM 4.4. <br /> <br />November 18, 1993 <br />File: 230-190-20 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: BID OPENING <br />1993 NORTHEAST AREA IMPROVEMENTS <br /> <br />Dear Council Members: <br /> <br />Bids were received and opened at 10:00 a.m. on November 17, 1993, for the above- <br />referenced project. This work would include extension of water main to serve the new water <br />tower as well as sanitary sewer improvements to serve a portion of the future Hillside <br />Estates 3rd Addition. A total of 16 bids were received. Following is a list of the <br />contractors and their bids. An itemized bid tabulation is also attached. <br /> <br />Contractor <br />Richard Knutson, Inc. <br />W. B. Miller, Inc. <br />R. L. Larson Excavating <br />Annandale Contracting, Inc. <br />Bonine Excavating <br />Northdale Construction <br />Burschville Construction <br />Kadlec Excavating <br />LaTour Construction <br />Quam Construction <br />Imperial Developers <br />S. J. Louis Construction <br />S. R. Weidema, Inc. <br />Kramer Excavating <br />F. M. Frattalone Excavating <br />C. W. Houle, Inc. <br /> <br />Bid <br />$163,065.20 <br />167,367.20 <br />169,664.10 <br />169,973.30 <br />173,757.46 <br />175,453.40 <br />175,811.50 <br />178,091.10 <br />183,203.50 <br />208,349.90 <br />218,430.52 <br />233,940.60 <br />233,985.35 <br />241,633.35 <br />242,889.25 <br />267,466.20 <br /> <br />The estimate for the water portion of the improvement was $150,000. Based on the bid <br />from Richard Knutson, Inc., the construction cost for this work is $111,736.40, which is <br />approximately 25.5% below the estimate. <br />