Laserfiche WebLink
<br />AI ~( <br />( II <br />1fl}{ River <br /> <br />EXHIBIT F <br /> <br /> <br />TO: <br /> <br />ECONOMIC DEVELOPMENT AUTHORITY <br /> <br />~ <br /> <br />FROM: <br /> <br />CLIFF SKOGSTAD, BUILDING OFFICIAL <br /> <br />DATE: NOVEMBER 23, 1993 <br /> <br />SUBJECT: MAIN STREET AND JACKSON (HOLE IN <br />THE GROUND) <br /> <br />With the possibility of a structure being placed on this site, <br />I do have some concerns that will need to be addressed prior to <br />issuance of a building permit.. The concerns are as follows: <br /> <br />Existing Foundation <br /> <br />1. After inspecting the existing foundation, I found <br />that this foundation has lost its structural <br />integrity and should have a new foundation to meet <br />the 1988 Uniform Building Code requirements. The <br />reasons for my recommendation are: <br /> <br />e <br /> <br />a. In the early 1900's when this structure was <br />built, the original foundation was probably not <br />designed by a structural engineer. The current <br />foundation may not meet todays loads as per the <br />Uniform Building Code. <br /> <br />b. This foundation was primarily made of field stone <br />and masonry units; it would be difficult to <br />determine load bearing capabi~ities. <br /> <br />c. After continual exposure to the elements of <br />nature, it has become apparent that deterioration <br />of the walls have taken its toll on this <br />structure. <br /> <br />d. When a fire burned this structure down, it placed <br />a considerable amount of heat on the foundation <br />walls. Damage to the foundation occurred and <br />structural integrity may have been lost. If <br />these walls are to be used, a structural engineer <br />would have to verify all structural integrity <br />prior to the issuance of a building permit. <br /> <br />2. Verification of frost depth footings will be required <br />from the south end of the structure. <br /> <br />3. All underground plumbing will have to be excavated <br />and have new waste and vent installed for the <br />following reasons: <br /> <br />e <br /> <br />a. Because of the heat of the fire and the exposure <br />to weather, the building sewer lines may not hold <br />an air test due to cracking, deterioration, etc. <br /> <br />P.O. Box 490 · 13065 Orono Parkway · Elk River, MN 55330 · (612) 441-7420 · Fax: (612) 441-7425 <br />