Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />. <br /> <br />TRAFFIC SUMMARY AND CONCLUSIONS <br /> <br />. <br /> <br />Site plan refinements have been included to provide effective <br />internal traffic and parking operations. <br /> <br />. <br /> <br />The methodologies used for the traffic forecasts and <br />analyses in the traffic study report prepared by Maier <br />Stewart & Assoc., Inc. (MSA) are consistent with <br />transportation engineering industry practices and standards. <br /> <br />. <br /> <br />To effectively accommodate projected post-development <br />traffic volumes, an overall set of improvements to nearby <br />roadways has been recommended. <br /> <br />- Provide a right in/out access driveway to/from <br />T.H. 169. <br /> <br />- Add a second northbound left turn lane at the T.H. <br />169/School Street intersection. <br /> <br />- Widen School Street between T.H. 169 and Freeport <br />A venue <br /> <br />- Signalize Freeport Avenue/School Street intersection <br />and interconnect with existing T .H. 169 signal <br /> <br />- Improve Jackson Avenue between T.H. 169 and <br />Freeport Avenue <br />