My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 09-13-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
09/13/1993 - SPECIAL
>
5.5. SR 09-13-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:18 AM
Creation date
6/28/2006 3:17:19 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/13/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ LATCII..JR C <br />e <br /> <br />e <br /> <br />e <br /> <br />:::stt"""'- ~..~ ";;;I'~ .."-"'..... ... - - -- -~ <br /> <br />q;l3/13 <br /> <br />~1. i") tlLlll.. + <br />,5~ S- <br />INC. <br /> <br /> <br />2134 Co. Rd. 8 N. ~ · Maple Lake, MN 55358 · 963-5993 · Fax 963-6017 <br /> <br />September 13" 1993 <br /> <br />Mr. Terry Maurer <br />Maier Stewart & Associates" Inc. <br />1959 Sloan Place, Suite 200 <br />St. Paul, MN 55117 <br /> <br />Dear Terry: <br /> <br />I am writing regarding LaTour Construction"s Bid for Alternate No.2 <br />for the Highway 10 Lift Station and Trunk Sanitary Sewer for the <br />City of Elk River. <br /> <br />After bids were opened on September 8" LaTOur reviewed the plans and <br />the bid and discovered that various mistakes had been made in the bid. <br />LaTour then contacted your office and identified two principle errors. <br />One in the pump station price and one 1n the pipe unit price due to a <br />factual mistake in the location of the existing sanitary sewer. In <br />addition, other aspects of the work considered incidental were <br />inadvertantly not included in LaTour"s bid. <br /> <br />The fact that the bid included these material mistakes is evident <br />because LaTour was in excess of 30% low ($130,000) compared to the <br />other three bidders that were within $20,,000 of each other. <br /> <br />LaTour requests that our bid be withdrawn and the bId bond returned <br />due to the mistakes in our bid. <br /> <br />If you have any questions, please contact me. <br /> <br />Sincerely" <br />LATOUR CONSTRUCTION, INC. <br /> <br />,~~ <br /> <br />Gary Thompson" Estimator <br /> <br />"1:"......, ,-,..._........_,.... ~__..__..___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.