My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 09-13-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
09/13/1993 - SPECIAL
>
5.5. SR 09-13-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:18 AM
Creation date
6/28/2006 3:17:19 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/13/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ITEM 5.5. <br /> <br />_ / f ~ ~ ~ ~ J.. CONSULTING ENGINEERS <br />e .".,,_ Maier Stewart & Associates Inc. <br /> <br />e <br /> <br />e <br /> <br />September 9, 1993 <br /> <br />File: 230-178-20 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: TRUNK IDGHWAY 10 LIFT STATION/SANITARY SEWER <br />CONSTRUCTION BIDS <br /> <br />Dear Council Members: <br /> <br />We have tabulated the bids received on Wednesday, August 8, 1993, for the Trunk Highway 10 <br />Lift Station and Trunk Sanitary Sewer Improvements. There were a total of four bids received. <br />The following list provides each of the bidders and their total bid: <br /> <br />LaTour Construction, Inc. <br />Northdale Construction, Inc. <br />Barbarosa & Sons, Inc. <br />Bonine Excavating, Inc. <br /> <br />$413,197.50 <br />$543,727.60 <br />$559,219.50 <br />$563,898.57 <br /> <br />Our preliminary estimate for this work was $350,000 to $400,000. During the preparation of <br />plans and specifications, a portable emergency generator was added along with some trunk <br />water main which will ultimately be needed for the East Trunk Highway 10 corridor but was <br />immediately adjacent to some of the sanitary sewer construction. Therefore, it made sense to <br />add this watermain construction to the project at this time to eliminate a duplication of <br />construction activities in the same area sometime in the future. These two items added <br />approximately $45,000 to the project cost. <br /> <br />LaTour Construction, Inc., has successfully completed similar projects in the past. They are <br />currently working on three projects: Heritage Landing, Mississippi Oaks, and Cherryhill Bluffs <br />2nd Addition in the City of Elk River. We would recommend award to LaTour Construction, <br />Inc., as the lowest responsible bidder. Attached is a draft resolution accepting the bid and <br />authorizing execution of a contract with LaTour Construction, Inc., for this improvement project. <br /> <br />1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612-774-6021 <br />9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS. MINNESOTA 55441 612-546-0432 · Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.