Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />TABLE 1. OPINION OF PROBABLE CONSTRUCTION COST <br />FOR THE INTERIM PLAN OF THE <br />ELK RIVER WWTP EXPANSION <br /> <br />THE CITY OF ELK RIVER, MINNESarA <br /> <br />MAIER STEWART & ASSOCIATES, INC. <br />AUGUST 1993 <br /> <br />DESCRIPTION <br /> <br />A. One Trickling Filter <br /> <br />B. Trickling Filter Pumping Station <br /> <br />C. Outside Piping <br /> <br />D. Electrical <br /> <br />Subtotal <br /> <br />Overhead and Administration (28 %) <br /> <br />lSl-OS04.aug <br /> <br /> COST ($) <br />$ 334,000 <br /> 145,000 <br /> 140,000 <br /> 100.000 <br />$ 719,000 <br /> 201.000 <br />$ 920,000 <br />Say $1,000,000 <br />