Laserfiche WebLink
<br />P Plat, North Meadows Addition <br />June 10, 1993 <br /> <br />Page 2 <br /> <br />8. THE COUNTY APPROVE THE GRADING AND DRAINAGE PLAN FOR <br />THIS PLAT. FURTHER, IF THE COUNTY NEEDS ENGINEERING <br />ASSISTANCE IT IS PROVIDED BY THE CITY ENGINEER AT THE <br />EXPENSE OF THE DEVELOPER. LASTLY, THAT 30 FEET OF <br />EASEMENT FROM THE CENTERLINE OF DITCH #28 IS <br />DEDICATED TO THE COUNTY. <br /> <br />9. THE DEVELOPER COOPERATE WITH THE COUNTY REGARDING A <br />REDISTRIBUTION/REASSESSMENT OF THE DITCH ASSESSMENT <br />PRIOR TO RECORDING THE PLAT. <br /> <br />10. THE PLAT IS CONTINGENT UPON A VARIANCE BEING GRANTED <br />ON LOT SIZE FOR LOTS 1-4, BLOCK 2. <br /> <br />11. THE DEVELOPER PROVIDE LOWEST FLOOR ELEVATIONS FOR <br />STAFF'S REVIEW AND APPROVAL PRIOR TO FINAL PLAT. <br /> <br />12. THE DEVELOPER PAY $2,400 IN PARK DEDICATION FEES. <br /> <br />13. THE DEVELOPER PAY THE COST OF THE FIRST SEAL COATING <br />FOR THE ROAD IN THE PLAT, AS ESTIMATED BY THE CITY <br />ENGINEER, PRIOR TO RECORDING THE PLAT. <br /> <br />14. BUILDING PERMITS ARE ALLOWED ONLY AFTER THE BASE FOR <br />THE ROAD IS APPROVED BY THE CITY ENGINEER. <br /> <br />15. A LETTER OF CREDIT IN THE AMOUNT OF 100% OF THE COST <br />OF PUBLIC IMPROVEMENTS IS PROVIDED BY THE DEVELOPER <br />PRIOR TO RECORDING THE PLAT. <br /> <br />16. THE COMPLETION DATE FOR PUBLIC IMPROVEMENTS IN THE <br />PLAT IS ONE YEAR FROM THE DATE OF FINAL PLAT APPROVAL. <br /> <br />17. THE DEVELOPER REIMBURSE THE CITY FOR THE ESTIMATED <br />COSTS OF REVIEWING THE PLAT PRIOR TO FINAL PLAT <br />REVIEW. <br /> <br />18. A DEVELOPERS AGREEMENT IS ENTERED INTO REFLECTING THE <br />STIPULATIONS OF APPROVAL OF THIS PLAT. <br /> <br />19. OAKS REMOVED FOR HOUSE CONSTRUCTION HAVE THEIR ROOTS <br />SEVERED (TO A DEPTH OF 5 FEET) FROM ADJACENT TREES <br />PRIOR TO BEING DROPPED OR HAVE THEIR STUMPS REMOVED <br />THE SAME DAY. FURTHER, ROOTS EXPOSED ARE REBURIED <br />THE SAME DAY AS THEY ARE EXPOSED. LASTLY, TREES THAT <br />ARE TO REMAIN AFTER CONSTRUCTION HAVE THEIR DRIP LINE <br />ROPED OFF TO DEFINE AN AREA OF NO ACTIVITY TO PROTECT <br />THEM FROM MECHANICAL DAMAGE. <br /> <br />20. A CERTIFIED SEPTIC INSPECTOR REVIEW BORINGS MADE <br />RECOMMENDATIONS FOR ON-SITE SEPTIC PRIOR TO BUILDING <br />PERMIT ISSUANCE. <br />