Laserfiche WebLink
<br />EXHIBIT <br /> <br />EXPENSES FOR THE CITY OF OTSEGO <br />WASTEWATER TREATMENT PLANT EXPANSION <br /> <br />City of Elk River, Minnesota <br />Maier Stewart & Associates, Inc. <br />June 1993 <br /> <br />Design Capacity, Million Gallons per Day (MGD) <br />City of Elk River <br />City of Otsego <br />Total <br /> <br />2.20 <br />0.35 <br />2.55 <br /> <br />Influent <br /> <br />biochemical oxygen demand (BOD), mg/l <br />total suspended solids (TSS), mg/l <br />BOD, mg/l <br />TSS, mg/l <br /> <br />2001 <br />2251 <br />10 <br />12 <br /> <br />Effluent <br /> <br />Construction Cost for 2.2 MOD Expansion <br /> <br />$6,000,000 <br />$7,000,000 <br /> <br />Construction Cost for 2.55 MGD Expansion <br /> <br />Otsego I S Cost: <br />A. Additional Construction Cost $1,000,000 <br />B. Share of Existing Facilities <br /> ($1,500,000 x 0.35/2.55) $200,000 <br />c. Metering and Sampling of Otsego 1 s Sewage $100,000 <br />D. Redesign Fee $100,000 <br />E. Administration Fee $100~OOO <br /> TOTAL2 $1,500,000 <br />