My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 06-07-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
06/07/1993
>
5.5. SR 06-07-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:15 AM
Creation date
6/19/2006 2:26:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/7/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TABLE 1 - PROBABLE COST FOR THE DIGESTER REHABILITATION <br /> <br />ELK RIVER W ASTEW A TER TREATMENT PLANT <br /> <br />Maier Stewart & Associates, Inc. <br />June 1993 <br /> <br /> Description <br />A~ Sand Blast and Recoat the Interior of the Digester Steel Domel $ 9, 100 <br />B. Digester Dome Anchorage Repair2 1 , 000 <br />c. 6-inch Sludge Transfer Pipe Support 500 <br />D. Sewage Gas Pipe Connection 500 <br />E. 24-inch Access Manway 1 ~500 <br /> TOTAL $12,600 <br /> <br />Notes: <br /> <br />SSPC-SP6 commercial blast cleaning and 1 coat of coal tar epoxy. <br /> <br />2 <br /> <br />Includes full penetration pressure grouting of approximately 5 LF of thermal related <br />concrete cracking under two observed anchorage points. This also includes approximately <br />3 LF of seal welding the anchorage clips to the steel dome. The seal welds will eliminate <br />water infiltration and prevent corrosive gases from escaping. <br />
The URL can be used to link to this page
Your browser does not support the video tag.