My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.5. SR 05-17-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
05/17/1993
>
7.5. SR 05-17-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:14 AM
Creation date
6/19/2006 1:50:24 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />. <br /> <br />_ / f ~ ~ ~ ~ CONSULTING ENGINEERS <br /> <br />~_I Maier Stewart & Associates Inc. <br />April 15, 1993 <br /> <br />File: 230-172-11 <br /> <br />Mr. Steve Rohlf <br />Building and Zoning Administrator <br />City of Elk River <br />P.O. Box 490 <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: BRUCE ADDmON REVIEW <br /> <br />Dear Mr. Rohlf: <br /> <br />As requested, we have reviewed the submittal for the Bruce Addition. Based on our review, we <br />would offer the following comments: <br /> <br />1. <br /> <br />General <br /> <br />The preliminary plat, grading, and drainage plan and utility plan we reviewed were <br />prepared by John Oliver and Associates. <br /> <br />2. <br /> <br />Preliminary Plat <br /> <br />The preliminary plat shows two single family lots of approximately 9,000 square feet <br />which front on 8th Street. It also shows 12 duplex lots, each 2,184 square feet, with the <br />remainder of the area as common space. <br /> <br />3. Perimeter Easement <br /> <br />Minimum 10- foot easements are provided around the perimeter as requested at the <br />concept review meeting. <br /> <br />4. Drainage <br /> <br />The fronts of the single family lots drain to 8th Street, which has sufficient storm sewer <br />to handle the flow. The remainder of the area flows overland to the existing drainage <br />pond to the southeast of the site. The drainage plan appears to be adequate to serve the <br />site. <br /> <br />1959 SLOAN PLACE. SUITE 200. ST. PAUL, MINNESOTA 55117 612.774-6021 <br />9800 SHELARD PARKWAY. SUITE 102. MINNEAPOLIS. MINNESOTA 55441 612-546-0432 . Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.