My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3. SR 05-03-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
05/03/1993
>
9.3. SR 05-03-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:13 AM
Creation date
6/15/2006 3:18:27 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/3/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_ / f ~ ~ ~ _~ 1. . CONSULTING ENGINEERS <br />. .",..- Maier Stewart & Associates Inc. <br /> <br />April 26, 1993 <br />File: 230-159-10 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />P.O. Box 490 <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: HERITAGE LANDING FEASffiILITY STUDY AMENDMENT <br />REGARDING FRESNO STREET IMPROVEMENTS <br /> <br />Dear Council Members: <br /> <br />. <br /> <br />This amendment to the Heritage Landing Feasibility Study was authorized by City Council <br />Resolution 93-19 passed at the April 26th regular meeting. This Feasibility Study deals with <br />street and storm drainage improvements to Fresno Street between County Road 30 and the <br />Sherburne County Fairgrounds. <br /> <br />The development of property south of County Road 30 has caused sanitary sewer and water to <br />be extended down Fresno Street. On April 1, 1993, the City Council held an informational <br />meeting with residents of Orono Lake 3rd Addition to determine if there was any interest in City <br />utilities and street improvements in this area. The majority of residents in attendance at this <br />informational meeting were opposed to any type of improvement. This informational meeting was <br />followed by mailed survey to all residents within Orono Lake 1st, 2nd, and 3rd Additions. The <br />majority of respondents to this survey were also opposed to improvements in the area. <br /> <br />Since there will be no area-wide improvement project in the Orono Lake Additions, it is <br />proposed to deal with the properties abutting the Fresno Street improvements in accordance with <br />previous City policy; that is, to assess the abutting properties for street and storm drainage <br />improvements but not to assess them for sanitary sewer or water improvements. As with the <br />1991 Western Area improvement, sanitary sewer and water service stubs will be provided to each <br />property abutting Fresno Street, but no assessment will be made for these utilities until the <br />property owner decides to connect or utilities are extended throughout the whole area. The <br />assessment for street and storm drainage improvements are based on front footage unit amounts <br />which for 1993 are proposed to be $22.00/front foot for street improvements and $8.00/front foot <br />for storm drainage improvements. <br /> <br />. <br /> <br />1959 SLOAN PLACE. SUITE 200. ST. PAUL. MINNESOTA 55117 612-774-6021 <br />9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612-546-0432 . Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.