My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. SR 04-24-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
04/24/1993 - SPECIAL
>
3.0. SR 04-24-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:12 AM
Creation date
6/15/2006 10:49:08 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/24/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />774 6021 MRIER STEWRRT RSSOC. <br /> <br />124 P04 <br /> <br />RPR 21'93 15:12 <br /> <br />. <br /> <br />February 23, 1993 <br />FUe: 230-161-80 <br /> <br />DRAFT <br /> <br />~'~ : <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />720 Dodge Avenue NW <br />Elk River, MN 55330 <br /> <br />RE: STORM WATER MASTER pLAN - POlley RECOM:MENDATlONS <br /> <br />Dear Council Members: <br /> <br />un'RODUCTION <br /> <br />. <br /> <br />The City of Elk River cuuently has no written policies regarding stonn water management <br />creating difficulty for City st2ff and council members in the review of proposed development. <br />The council has authorized the first stage in preparation of a Storm Water Management Plan. <br />This stage will propose various policies for City consideration. <br /> <br />'.. :., <br /> <br />Providing adequate storm. drainage facilities is an important requirement in the development <br />of any municipality. As an area develops from rural to urban, culvert and drainageways <br />which were adequate for rural runoff can beCome overloaded and flood, and property damage <br />can occur. The function of a stonn drainage system is to minimize economic loss and <br />inconvenience due to this periodic flooding of streets, basements and other low lying areas. <br />The desired goal to reach is when storm flooding damage, plus the cost of storm sewer <br />installation, reaches a minimum. Storm drainage facilities can also reduce inconveniences and <br />hazards caused by flooding. <br /> <br />Frequently, the downstream area of a drainage basin develops earlier than the remainder of <br />the basin. 'When this happens, drainage facilities that are installed as part of the early <br />development may be sized solely for the development occurring without consideration of the <br />development of the remainder of the basin. A storm drainage master plan considers the entire <br />dIainage basin and avoids costly erron, such as replacement of inadequate stonn sewer pipe <br />in developed areas. <br /> <br />'.. <br /> <br />If a storm drainage master plan is implemented, planning and construction of required <br />facilities is established in the early development stages of a drainage basin. Required storm <br />sewer piping and ponding areas can be easily incorporated into a developer's plan. Regional <br />ponding areas can be planned, land can be obtained, and possibly integrated into a City park. <br />The cost of acquiring drainage easements will be low when the land is still rural compared to <br />its cost after development of the area has increased the land value. <br />
The URL can be used to link to this page
Your browser does not support the video tag.