My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.12. SR 04-19-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
04/19/1993
>
6.12. SR 04-19-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:12 AM
Creation date
6/15/2006 8:54:43 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/19/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MAR-17-93 WED <br /> <br />9:10 MAIER STEWART & ASSOC. <br /> <br />P.03 <br /> <br />. <br /> <br />Mr. Steve Rohlf <br />March 16, 1993 <br />Page Three <br /> <br />3. Currently, there is not sufficient capacity in the water booster station to service <br />this many additional lots. Development of a high pressure water system will be <br />necessary to adequately provide water service. <br /> <br />F. :> trecu <br /> <br />1. The street grades proposed appear to be adequate. <br /> <br />2. <br /> <br />A permanent cul-de-sac with a 45-foot radius should be provided for at the end <br />of Freeport Street. Although this cut-dc-sac may eventually be eliminated, it <br />should be constructed as if it is a permanent installation. Temporary easements <br />could be provided for the purposes of constructing the cuI-dc-sac. These <br />easements would automatically be vacated in the case of the extension of Freeport <br />Street. <br /> <br />. <br /> <br />3. The street section shown on the grading plan appears to be adequate; however, <br />the 32.foot width should be measured from face of curb to face of curb. During <br />the design phase, soil borings would be taken to verify the street section. <br /> <br />4. An "eyebrow" is proposed on 190th Avenue as it enters the plat. This will result <br />in four driveways in the proximity of the intersection of Evans and 190th. This <br />could potentially cause traffic conflicts between cars accessing driveways and cars <br />entering and exiting the plat. <br /> <br />If you have any questions regarding any of these comments, please can. <br /> <br />Sincerely, <br /> <br />MAIER STEWART & ASSOCIATES, INC. <br /> <br />Terry J. Maurer, P.E. <br /> <br />. TJM:tp <br />
The URL can be used to link to this page
Your browser does not support the video tag.