My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. SR 03-15-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
03/15/1993
>
7.4. SR 03-15-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:09 AM
Creation date
5/31/2006 4:16:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />_ / j,- ~ ~ ~ ~ CONSULTING ENGINEERS <br />"""1 Maier Stewart & Associates Inc. <br /> <br />March 5, 1993 <br /> <br />IfE'CEI1/ <br />[ /} .A!4e ' <br />00lrn I <br />i9J <br /> <br />File: 235-004-20 <br /> <br />Mr. Pat Klaers, Administrator <br />City of Elk River <br />720 Dodge Avenue NW <br />Elk River, MN 55330 <br /> <br />RE: WATER TOWER SITE ACQUISmON <br /> <br />Dear Mr. Klaers: <br /> <br />As you requested, we have reviewed the letter from Mr. Rick Foster regarding the acquisition <br />of the water tower site. Specifically, we have reviewed the first three items listed under Other <br />Considerations on page 2. Based on our review, we would offer the following comments: <br /> <br />1. <br /> <br />The City pay for any surveying (other than design and layout) and legal work <br />required. <br /> <br />If the developer provides a calculation sheet showing the access easement and the water <br />tower site, as he has indicated he will, this should be sufficient. Prior to establishing the <br />location of the new water tower or the watermain leading to it, our survey crews would <br />always establish or reestablish the easement limits. Therefore, we have no problem with <br />Mr. Foster's proposal on this item. <br /> <br />2. Access road to be cleared and graded at the City's expense. <br /> <br />The clearing, grubbing, and grading of the easement (future road right-of-way) is <br />necessary to install the watermain at the proper elevation. However, it certainly benefits <br />future phases of Hillside Estates. Therefore, we believe the developer should, at a <br />minimum, participate in this cost. <br /> <br />3. <br /> <br />No assessment on these improvements (tower and watermain) until the property is <br />platted. <br /> <br />We do not concur that the tower and watermain should not be assessed until the property <br />is platted. However, there is the issue of sanitary sewer. With the new water tower and <br />watermains, the property still cannot be developed until trunk sanitary sewer is made <br />available from the southwest. It may be reasonable to not assess this property for either <br /> <br />1959 SLOAN PLACE. SUITE 200, Sf. PAUL, MINNESOTA 55117 612-774-6021 <br />9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS. MINNESOTA 55441 612-546-0432 · Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.