My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 03-15-1993
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1993
>
03/15/1993
>
6.4. SR 03-15-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:09 AM
Creation date
5/31/2006 4:11:20 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Construction or operation in violation of any of the <br />material statements of fact, factual information, or <br />representations in the referenced documents shall be <br />deemed to be a violation of the Permit and all such <br />documents are considered to be and are hereby made a <br />part of the Permit. <br /> <br />2 . <br /> <br />Building construction, driveways, parking, grading, <br />utilities, surface water management, erosion control, <br />landscaping, fencing, and screening for the Processing <br />Facility shall be provided substantially in accordance <br />with the plans submitted by Northern States Power <br />Company with the original application for a <br />conditional use permit and the November 28, 1989 <br />application for renewal of conditional use permit, <br />which are hereby made a part of this Permit. In <br />addition, these plans shall be further revised to <br />provide a hard surfaced, diked area to drop hot loads <br />of processed RDF so that they can be put out and fire <br />suppression water retained; and to further provide <br />that all areas on the facility site are either hard <br />surfaced parking and drive areas, pea rock or asphalt <br />shavings for equipment storage, or landscaped areas <br />with grass. There shall be no gravel or dirt areas on <br />the facility site. The revised plans shall be <br />submitted by December 31, 1990, and all improvements <br />installed by September 30, 1991. <br /> <br />3 . <br /> <br />All utility and street construction plans and <br />specifications as presented by Northern States Power <br />Company for the Facility and servicing streets must be <br />prepared by a Registered Civil Engineer in accordance <br />with directions of and approved by the City Engineer. <br /> <br />4. All building plans and specifications must be approved <br />by the City Building Inspector and Fire Chief. <br /> <br />5. Approval of driveway entrances, if needed, on State <br />and County highways shall be secured from the <br />appropriate agencies and filed with the City Zoning <br />Administrator prior to issuance of any building <br />permit. Street lighting and acceleration and <br />deceleration lanes for Highway 10 at the intersection <br />of 165th Street and Highway 10 shall be installed by <br />City to provide safe access to Highway 10 for trucks <br />entering and leaving the Facility. Failure by <br />Permittee to reimburse the City for the installation <br />of said improvements within thirty (30) days of <br />receiving an invoice for all or any part of said <br />improvements shall be cause for revocation of this <br />Permit. <br /> <br />6 . <br /> <br />The City shall have the right of access to all areas <br />of the Processing Facility and site for the purpose of <br /> <br />2 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.