Laserfiche WebLink
<br />. <br /> <br />12. At the Processing Facility, all truck and Processing <br />Facility wash water shall be diverted and captured in <br />a retention tank so that it does not enter the <br />groundwater system. No RDF or Residue trucks may be <br />washed at the Burn Facility. <br /> <br />13. The Processing Facility shall be enclosed by a minimum <br />six-foot and no more than eight-foot high chain link <br />fence. <br /> <br />14. The Processing Facility shall undertake no processing <br />of MSW until all appropriate items in this Permit and <br />the building permit are completed and finally <br />inspected by the City of Elk River Zoning <br />Administrator and a written certificate of occupancy <br />has been issued. <br /> <br />15. Permittee shall test storm water run-off captured in <br />the on-site retention/detention pond, and shall <br />provide written reports on these test results to the <br />City, as provided in the rain water run-off sampling <br />plan submitted by Permittee. If the required tests <br />indicate water quality problems in rain water run-off, <br />Permittee shall submit to the City for approval a plan <br />for addressing such problems and shall implement such <br />solutions as are required by City. <br /> <br />. <br /> <br />16. The Permittee shall engage in a regular and routine <br />litter maintenance and removal program extending <br />(a) one-half mile east of the Processing Facility <br />entrance on 165th Street Northwest, (b) southeast on <br />Highway 10 from the intersection of 165th Street <br />Northwest with Highway 10 to the eastern city limits, <br />(c) northwest on Highway 10 from said intersection to <br />the intersection of Highway 10 and Highway 169, and <br />(d) any other areas adversely impacted by debris <br />related to Facility operations as may be determined by <br />the City. Litter shall be removed from these areas no <br />less than once per week, and more often if necessary <br />because of spills or complaints from neighboring <br />property owners, to ensure that these areas are kept <br />free of litter generated by truck traffic traveling to <br />and from the Facility. In addition, Permittee shall <br />inspect all trucks leaving the plant to ensure that <br />they are either fully enclosed or covered, and/or <br />clean, and will not spread litter on surrounding <br />streets and roadways as they leave. <br /> <br />. <br /> <br />17. The Permittee shall immediately pay to reimburse the <br />City for any and all expenses associated with initial <br />Processing Facility-related improvements on 165th <br />Street from the Processing Facility entrance to the <br />intersection with Highway 10, and on any other city <br />streets used by vehicles transporting RDF or Residue <br /> <br />5. <br />