Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />,- <br /> <br />:;& <br /> <br />. <br /> <br />.I <br /> <br />5.3. storm Water Master Plan <br /> <br />Terry Maurer, City Engineer, stated that per Council direction he has <br />drafted a master plan proposal pertaining to storm sewer for the City <br /> <br />Elk River City Council Minutes <br />December 21, 1992 <br /> <br />Page 3 <br /> <br />of Elk River. Terry Maurer reviewed the storm drainage plan which <br />involves three stages: 1.) establish urban/rural storm drainage <br />policies; 2.) urban area storm drainage system design; 3.) establish <br />storm water utility fund. Terry Maurer indicated that the estimated <br />cost to complete the three stages is $19,500. The City Administrator <br />indicated that the master plan proposal could be funded through the <br />Capital Projects Fund. <br /> <br />Councilmember Dietz stated that he would prefer to proceed with step 1 <br />of the plan prior to authorizing stages 2 and 3. <br /> <br />COUNCILMEMBER DIETZ MOVED <br />MASTER PLAN CONSISTING <br />POLICIES AT A COST NOT <br />SECONDED THE MOTION. THE <br /> <br />TO AUTHORIZE STAGE 1 OF THE STORM WATER <br />OF ESTABLISHING THE URBAN/RURAL STORM DRAINAGE <br />TO EXCEED $1,500. COUNCILMEMBER HOLMGREN <br />MOTION CARRIED 5-0. <br />