Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />7.1 <br /> <br />. <br /> <br />4) <br /> <br />Schedule of anticipated starting and completion date of each land disturhing <br />activity including the installation of construction site erosion controlllleasurc~s <br />needed to meet the requirements of this ordinance; and <br /> <br />5) Provisions for maintenance of the construction site erosion control measures <br />during construction. <br /> <br />e) Plan of final site conditions. A plan of final site conditions on the same sC<lle as the <br />existing site map showing the site changes including: <br /> <br />1) Finished grading shown at contours at tile same interval as provided above or <br />as required to clearly indicate the relationship of proposed changes tll existing <br />topography and remaining features; <br /> <br />2) A landscape plan, drawn to an appropriate scale, including dimensions and <br />distances and the location, type, size and description of all proposed landseupe <br />materials which will be added to the site as part of the development; <br /> <br />3) A drainage plan of the developed site delineating in which direction and at <br />what rate storm water will be conveyed from the site and setting forth the <br />areas of the site where storm water will be allowed to collect; <br /> <br />4) The proposed size, alignment and intended use of any structures to he erected <br />on the site; <br /> <br />5) <br /> <br />A clear delineation and tabulation of all areas which shall be paved or <br />surfaced, including a description of the surfacing material to be us(;d; and <br /> <br />6) Any other information pertinent to the particular project which in the opinion <br />of the applicant is necessary for the review of the project. <br /> <br />7. PLAN REVIEW PROCEDURE <br /> <br />r~. Storm water management plans meeting the requirements of Section (\ shall be <br />suhmitted by the [planning department, department of community development, zoning <br />administrator] to the Planning Commission for review in accordance with the standards of <br />S~clion 8. The Commission shall recommend approval, recommend approval with conditions, <br />or recommend denial of the storm water management plan. Following Planning Commission <br />action, the storm water management plan shall be submitted to the [City Council, Town <br />Board, County Board] at its next available meeting. [City Council, Town Board, County <br />Doard] action on the storm water management plan must be accomplished within 120 days <br />following the date the application for approval is filed with the [planning department. <br />department of community development, zoning administrator]. <br /> <br />[COMMENTARY: The process outlin~d in Section 7.1 can be modified to be consistellt with the <br />regulatory process of the particular local government unit. For example, one local gm'emment <br />may have a particular department .....hich reviews land use regulatory matters except the final <br />decision to approve or deny a land we plan or pennit which is reserved for the gove17ling body <br />of the local government unit. Another local governmental unit may provide the dqJartmenl <br />which reviews land use regulatory mailers with full authority to take jinal actioll 011 the <br />application. Other local governments may use a hybrid process where some pemlits lire acted <br />upon by the appropriate regulatory dt!partment while other land use matters are hit to lh~ <br />gOl.erning body for jinal approval.] <br /> <br />7.2 <br /> <br />Duration. Approval of a plan submillcd under the provisions of this ordinance shall cxpire <br />