Laserfiche WebLink
<br />. <br /> <br />PerJ-f!m!" <br /> <br />Page 2. <br /> <br />The quote obtained from Aho Construction, Inc. (the building <br />contractor) to put in the required extension of Service <br />Drive, 60' on the adjoining lot, and 169' on the proposed <br />lot came in at $13,000. Sewer & water extensions to the <br />building would cost $5,000. and another $7,385. for a drive <br />way & parking lot. These costs along with the purchase price <br />of the property itself ($20 to $26 K) would bring the site <br />acquisition and improvement cost conservatively to <br />$47,385., that's not inCluding the landscaping that would be <br />necessary. <br /> <br />. <br /> <br />It would be nice to locate in the Elk River Industrial Park <br />and keep our school tax dollars in the same district, but <br />with out substantial assistance in some form to offset the <br />site costs I don't believe it will be possible. <br /> <br />Sincerely, <br /> <br />5h.~r/~ <br /> <br />Douglas F. Koelfgen <br />President, Perf-form Products, Inc. <br /> <br />. <br /> <br />21595 Cty. Rd. 83 N., Big Lake, MN 55309 · Phone (612) 263-6615 <br />