My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-06-1994 EDA MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Minutes
>
1990 - 1999
>
1994
>
06-06-1994 EDA MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:02 AM
Creation date
5/5/2006 3:30:33 PM
Metadata
Fields
Template:
City Government
type
EDM
date
6/6/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SPECIAL MEETING OF THE ELK RIVER ECONOMIC <br />DEVELOPMENT AUTHORITY <br />HELD AT THE ELK RIVER CITY HALL <br />MONDAY, JUNE 6, 1994 <br /> <br />Members Present: <br /> <br />President Gongoll, Commissioners Holmgren, Duitsman, Scheel, <br />Dwyer, Farber, and Dietz <br /> <br />Members Absent: <br /> <br />None <br /> <br />Staff Present: <br /> <br />Bill Rubin, Executive Director; Sandra Thackeray, City Clerk <br /> <br />1 . Call Meetinq To Order <br /> <br />Pursuant to due call and notice thereof, the special meeting of the Elk River <br />Economic Development Authority was called to order at 5:45 p.m. by President <br />Gongoll. <br /> <br />2. Consider June 6, 1994, EDA Agenda <br /> <br />The June 6, 1994, EDA agenda was approved by consensus of the EDA. <br /> <br />3. Public Hearina: Proposed Sale of approximately 2.17 acres of land to Alltool <br />Manufacturing Company, Inc. <br />4. Consider a Quit Claim Deed conveyinq approximately 2.1 7 acres of land to <br />Alltool Manufacturinq Company, Inc. <br /> <br />Executive Director Bill Rubin informed the EDA that Alltool Manufacturing <br />Company, Inc., is proposing a 40,000 square foot expansion to its existing 85,000 <br />square foot facility in the Elk River Industrial Park. He indicated that the proposed <br />expansion will begin to exceed certain provisions of the Uniform Building Code <br />relative to the need for a fire lane and for additional setback areas for the <br />building. He further explained that Alltool's existing site cannot accommodate <br />both of these requirements. He indicated that he is requesting the EDA to <br />consider conveying a 100 foot strip of property which is currently owned by the <br />EDA to Alltool. He stated that the strip of property is located to the west of Alltool, <br />is unplatted, and is not considered a viable industrial site. <br /> <br />President Gongoll opened the public hearing. <br /> <br />Commissioner Dwyer questioned whether Alltool would be requesting other <br />financial assistance such as Tax Increment Financing from the City. Bill Rubin <br />indicated that Alltool would not be requesting any other TIF assistance from the <br />City. Commissioner Dwyer stated that it seemed to be a good idea conveying <br />park of an EDA-owned site to Alltool in order to assist the company with a <br />significant expansion in Elk River. <br /> <br />There being no comments from the public, President Gongoll closed the public <br />hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.