My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 05-01-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
05/01/2006
>
6.3. SR 05-01-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:59 AM
Creation date
4/28/2006 10:07:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/1/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I. INTRODUCTION <br /> <br />This feasibility report for utilities and street construction on Naples Street and 186th Avenue was <br />authorized based on a petition received by the Elk River City Council and adoption of Council <br />Resolution 05-126 passed on November 21,2005. The location of the proposed project is presented <br />on Exhibit 1. <br /> <br />II. PROJECT SCOPE <br /> <br />The purpose of this study is to analyze the feasibility of extending city sanitary sewer and watermain <br />into the neighborhood of Naples Street and 186th Avenue. The street would then be reconstructed to <br />an urban standard with concrete curb and gutter. This study will discuss the history of the project, the <br />proposed improvements, right of way needs, estimated project costs, proposed funding, and possible <br />project schedule. This project will be accomplished under Minnesota Statute 429, and will thus <br />require a public hearing and an assessment hearing. Project costs consist of estimated construction <br />costs plus overhead, which includes City administration, engineering, fiscal, and legal expenses. The <br />City's current assessment policy and past practices will be used "as a guide to discuss financing <br />methods for this project. <br /> <br />III. PROJECT HISTORY <br /> <br />The first petition for improvements in this area was received in August of 1990. At that time, this <br />was considered a private road serving the residential properties on Naples Street and I 86th Avenue. <br />The petition sought the City's help in upgrading the road and taking over the maintenance. Through a <br />series of informational meetings and discussions with the property owners, by the mid-1990's, the <br />City had agreed to take over maintenance of the gravel road, if in fact the residents would provide <br />easements to the City for access to the road. By the mid-1990's, all but four properties had given the <br />City the necessary easements. At that point in time, the City crews went in, made a minor gravel road <br />upgrade, and have been providing snowplowing services since. In 2002, a resident of the area <br />appeared at a City Council meeting Open Mike session and requested City consideration of extending <br />sanitary sewer, water and permanent streets to the area. The City Council authorized staff to do some <br />preliminary work on this issue and hold an informational meeting. That informational meeting was <br />held in October of 2002 and the outcome was that the neighborhood was almost evenly split with <br />those interested in City improvements and those disinterested. No further actions were taken on this <br />proposed project until the most recent petition was received in October of2005. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.