My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 04-11-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2006
>
04-11-2006
>
5.3. PCSR 04-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 3:07:26 PM
Creation date
4/12/2006 3:21:04 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/11/2006
case
CU 06-07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />PH (763) 498. 7844 <br /> <br />FX (763) 498. 9951 <br /> <br />(800) 627. 1669 <br /> <br />Mr. Chris Leeseberg <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, :MN 55330 <br /> <br />Re: Pearle Vision, Elk Ridge Center (File #226-124P) <br /> <br />In response to city comments contained in Memorandum dated March 8, 2006 we present the <br />following: <br /> <br />1. Elk Ridge Center 2nd Addition plat has been revised since the 3rd Addition was recorded. The <br />plat is ready for signatures and the client (Hempel Properties) has been contacted. <br /> <br />2. Attached is a copy of drawing A-lr indicating areas to be paved (shaded area) in order to <br />maintain access to the site. Hempel Properties has indicated they will construct the ring road and <br />necessary infrastructure as soon as weather permits. <br /> <br />. <br /> <br />3. Drawing A-Ir indicates extended paving area beyond the property lines. This area will be <br />paved at the same time the property lot is completed. <br /> <br />4. Schoell Madson will be submitting revised drawings showing connection to mainline pipe. <br /> <br />5. The water service was shown incorrectly on Utility Plan UI dated 2/23/06. The six inch line <br />will extend around the building along the north side to the rear into the mechanical room. The <br />domestic will extend from the main in the mechanical room. All reference to watermain entering <br />building on east/front side of building to be deleted. <br /> <br />6. An additional easement document will be provided. <br /> <br />7. The building will be shifted to the north and reduced in size so that no portion of the building <br />structure will encroach into the utility easement. <br /> <br />8. The NPDE Subdivision registration was signed and sent to the MPCA on March 8, 2006. <br />Schoell Madson will prepare the SWPPP in an 8-l/2X 11 formats. <br />~ --:? ~ <br />Sinc~r.ely.j/ /"--/ <br />./ / 'l <br />/.....~.// // <br />/~ t>-- ~ .' <br />i/' Scott Burs - Project Manager <br />. Ebert Construction <br /> <br />Attachments <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.