My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 04-11-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2006
>
04-11-2006
>
5.3. PCSR 04-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 3:07:26 PM
Creation date
4/12/2006 3:21:04 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/11/2006
case
CU 06-07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />. <br /> <br />4. Sheet D.l shows the sanitary sewer service for Pearle Vision coming out of an existing <br />manhole. TIlls is not allowed. Sewer services must connect direcdyto the main line <br />pipe and not into a manhole. TIlls comment will be made on the Elk Ridge Center <br />Phase Two construction plans also, which provides the stub for the sewer service. Also, <br />the sewer service is in excess of 100 feet long. Therefore, it requires a cleanout <br />according to uty ordinance. <br /> <br />5. The water service is provided from a six-inch line that enters the front of the facilityfor <br />fire protection and the. back of the facility for domestic service. Domestic service is in <br />excess of 180 feet long. We question why the domestic service could not continue from <br />the fire service connection in the front of the facility, under the building and come up in <br />the mechanical room. <br /> <br />6. A drainage and utility easement in favor of the uty of Elk River will be required over the <br />water service up to the point of the hydrant on the site. TIlls portion of the watermain <br />including the hydrant will be considered public, so that we have the ability to operate and <br />maintain the hydrant to ensure that it is in working order. TIlls drainage and utility <br />easement can be provided on the plat, since the plat needs to be re-done, or it can be <br />provided in an additional easement document. <br /> <br />. <br /> <br />7. It appears that on Sheet S.1. portions of the building encroach into the existing drainage <br />and utility easement surrounding the pond located to the west of the Pearle Vision <br />building. TIlls should be verified and the building moved, if necessary to ensure that <br />there is no easement encroachment. <br /> <br />8. The site will require a NPDES permit and a Storm Water Pollution Prevention Plan <br />(SWPPPP). The SWPPP needs to be in an 8 ~"x 11" format, signed by the owner, <br />engineer, and contractor. <br /> <br />If you have any questions, please call. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.