Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Page 6 <br /> <br />governmental entities. The Operator shall adhere to <br />these plans in the event there is a spill. <br /> <br />b. <br /> <br />The Operator shall provide the Fire Department with a <br />copy of their flammable or hazardous materials. <br /> <br />c. <br /> <br />Fuel tanks shall be above ground, properly diked (if <br />required by law), and registered with MPCA. <br /> <br />d. <br /> <br />All incidences that have the potential to adversely affect <br />groundwater, including but not limited to spills, shall be <br />verbally reported to the City within 24 hours. This verbal <br />notification shall be followed up in writing within four (4) <br />working days. <br /> <br />e. <br /> <br />The appropriate storm water permits (NPDES) shall be <br />obtained by the Operator from MPCA and copied to the <br />City. <br /> <br />f. <br /> <br />The wells located at the site shall be monitored once. a <br />year for diesel range organics (DRO). Mining activities <br />shall not take place closer to ground water levels than <br />indicated in the plans submitted without amending this <br />conditional use permit; however, if mining is proposed to <br />occur below the water table in the future, the above <br />referenced wells shall be monitored for DRO prior to <br />excavation activities commencing and after their <br />cessation each year. Further, in the event of a spill, <br />appropriate water tests (as determined by the city) will be <br />taken until the spill is deemed clean by the city. <br /> <br />g. Except for minor repairs, maintenance of vehicles and <br />equipment shall take place in the Operator's shop. The <br />Operator shall have an approved hazardous waste license <br />for this facility and properly dispose of all waste. <br /> <br />h. A minimum of a two-celled system to recycle water from <br />the wash operation shall be utilized. <br /> <br />1. <br /> <br />Each year, groundwater levels shall be monitored prior to <br />start of wash operations and an additional three (3) times <br />during the first week of said operation to predict the long <br />term effects of the pump operation. Thereafter, the <br />aforementioned well shall be tested a minimum of twice <br />per month, said frequency to be increased during dry <br /> <br />s: \b&e \rebecca \gravel pit \gravel pits \midwest \gravcup-midwest.doc <br />