Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />6. Estimated Dailv Truck Traffic & Traffic Route: <br /> <br />Estimated Average daily number of vehicles accessing the facility: <br /> <br />40 <br /> <br />Estimated peak daily number of vehicles accessing the facility: <br /> <br />210 <br /> <br />Estimated operator-owned vehicles: <br /> <br />1/3 of vehicles could be operator-owned <br /> <br />Estimated non-operator owned vehicles: <br /> <br />2/3 of vehicles could be non-operator-owned <br /> <br />Traffic Route: <br /> <br />Material removed from the excavation site shall be transported within the city <br />exclusively upon the following haul route: 221 st Ave. east to Highway 169 <br />(Except for localized jobs or customers with localized jobs) <br /> <br />9 <br />