Laserfiche WebLink
Head <br />of <br />Plant <br />Splitter <br />Structure <br />2026 thru 2030 <br />Capital Improvement Plan <br />Elk River, Minnesota <br />Project #WW-31 <br />Project Name Head of Plant Splitter Structure <br />Contact Public Works Director Department Sewer Department <br />Type Improvement Category Utilities <br />Status Active Useful Life 20 years <br />Description <br />Installation of splitter structure before the headworks building so influent can be isolated and managed at atmospheric pressure conditions. <br />Build out remaining UV building capacity by adding bulbs in second channel. <br />Justification <br />Currently the wastewater treatment facility is fed with three main lift stations that force (under pressure) flow into the headworks building. The addition of the splitter structure <br />will allow the influent to gravity feed the plant giving far more operational control and ability to expand to receive additional connections in the future (if NW or NW service <br />area expansions ever are considered). <br />As our flow is increasing the need for additional disinfection capacity grows.Our building is set up for the needed expansion and we estimate needing to have some of this <br />capacity on-line by 2028. <br />Funding Sources 2026 2027 2028 2029 2030 Total <br />Sewer Fund 0 0 3,800,000 0 0 3,800,000 <br />Total 0 0 3,800,000 0 0 3,800,000 <br />Produced Using Plan-It CIP Software Page 149 of 312