My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-12-18 - ERMU - Special Commission Meeting
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2025-2030
>
2025
>
12-18-2025
>
2025-12-18 - ERMU - Special Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 9:48:14 AM
Creation date
12/18/2025 9:41:11 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- 7 - <br /> <br /> Section 3 <br />Cost-of-Service <br /> <br />A cost-of-service analysis was performed to determine the allocated cost to serve <br />ERMU’s customer classes within the water utility. Customer classes exist, in part, <br />because the cost to serve different kinds of customers varies. The cost-of-service <br />analysis has been performed on a 2024 Test Year’ based on actual 2024 <br />financials, operations and sales. The results of the cost-of-service study give an <br />indication of the degree of revenue recovery warranted for each class of <br />customers. A comparison of the allocated cost to serve a class of customers and <br />the actual revenues received from that class is taken into consideration during rate <br />design. <br />Functionalization of Costs <br />ERMU’s Test Year water revenue requirements have been divided into four <br />functional categories. These categories are described below. <br />Plant – costs associated with ERMU’s source of supply and pumping. <br />Distribution – distribution expenses are related to the ERMU system for delivering <br />water to ERMU customers over the local pipeline system. <br />Customer – these costs are fixed costs associated with the service facilities <br />utilized to deliver water directly to customers. They also include items such as <br />meter reading, billing, collections and dealing with customers by customer service <br />representatives. <br />Revenue – revenue related costs include certain non-operating revenues and <br />utility margin.
The URL can be used to link to this page
Your browser does not support the video tag.