My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-12-18 - ERMU - Special Commission Meeting
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2025
>
12-18-2025
>
2025-12-18 - ERMU - Special Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 9:48:14 AM
Creation date
12/18/2025 9:41:11 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br /> <br /> <br /> <br /> <br />ELECTRIC VEHICLE CHARGING RATES <br /> <br />Residential and Commercial Electric Vehicle Charging Rate <br /> <br />Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br /> <br />Applicable to: Single family residences, non-demand and demand customers receiving service under <br />another rate (does not include privately-owned public chargers). <br /> <br />Electric Vehicle Charging Rate: This Program is available to all customers of ERMU that own an <br />electrically powered vehicle used for on road transportation. Charging of the vehicle can occur any time <br />but will be subject to on-peak and off-peak energy charges per hour daily. On-peak hours are Monday <br />through Friday between 10 AM and 10 PM. Off-peak hours are Monday through Friday between 10 PM <br />and 10 AM, Saturdays, Sundays, and the following holidays (New Year’s Day, Memorial Day, <br />Independence Day, Labor Day, Thanksgiving Day, and Christmas Day). <br /> <br />To qualify for the special rate, the customer shall provide: <br /> <br />1. Electric vehicle charging station that is used for the sole purpose of charging electric vehicles. <br />This charging station must be 240 volt. <br />2. Customer is responsible for installation of the additional meter socket in a mutually agreed upon <br />location. <br />3. Inspection by a State Certified electrical inspector of all metering equipment and provide an <br />affidavit to ERMU when completed. <br /> <br />ERMU shall provide: <br /> <br />1. All on-peak electric energy consumed by the electric vehicle charging equipment will be at the <br />summer rate of $0.137334 0.14106 /kWh for the five monthly billing periods of June – October, <br />and the winter rate of $0. 12548 0.12911/kWh for the seven monthly billing periods of <br />November – May. <br />2. All off-peak electric energy consumed by electric vehicle charging equipment will be at the rate <br />of $0.0651 0.06858/kWh. <br />3. This equipment will be available for charging at applicable rates 24 hours per day and is not <br />subject to any load control strategies. <br />4. All electric energy provided to an account that participates in this rate will be automatically <br />enrolled in the Clean Energy Choice Program at the 100 percent participation level at no <br />additional monthly charge. <br />5. All electric energy provided for the electric vehicle charging equipment will be 100 percent <br />renewable. <br />6. Electric meter.
The URL can be used to link to this page
Your browser does not support the video tag.