My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 03-14-2006
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2006
>
03-14-2006
>
5.2. PCSR 03-14-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2007 3:09:47 PM
Creation date
3/27/2006 8:45:34 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/14/2006
case
P 06-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Because it is seen as a temporary access, the County will not be requiring a right turn <br />lane or bypass lane to be built on County Road 12l. <br /> <br />4. This project has gone through the Technical Evaluation Panel (fEP) and has <br />received approval for the required wet land impact. <br /> <br />5. The project should be required to provide a development plan showing potential <br />house locations and style and, more importantly, primary and secondary septic sites. <br />These sites should be determined by soil boring to be adequate for on-site septic <br />systems. These sites should also be fenced and protected during lot grading and! or <br />house building. <br /> <br />. 6. The project will be required to obtain an NPDS permit and submit a Storm Water <br />Pollution Prevention Plan (SWPPP) needs to be in an 8 ~ X 11 format signed by the <br />engineer, contractor, and developer. <br /> <br />7. When construction plans are submitted they should include a signing plan. Initially <br />the street name sign at the intersection of 208th Court and County Road 121 should <br />include a "No Oudet:" plate; in addition, a sign provided by the City shall be <br />installed at the cul-de-sac indicating that the cul-de-sac will be a future City of Elk <br />River road extension. <br /> <br />. <br /> <br />8. Storm water calculations have been submitted and reviewed. They are generally <br />acceptable. Details will be need to be reviewed when the construction plans and <br />specifications are submitted. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />. <br /> <br />S:\PLANNING\Case Files\2006\Plat\P 06-01 CavetWoodHills\03 1006 CatverwoodHills.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.