|
Pavement
<br />Management
<br />-
<br />Streets
<br />2026 thru 2030
<br />Infrastructure Improvements
<br />Elk River, Minnesota
<br />Project #PM-01
<br />Project Name Pavement Management - Streets
<br />Contact Public Works Director Department Infrastructure Improvements
<br />Type Improvement Category Street Construction
<br />Status Active Useful Life 25 years
<br />Description
<br />Preventative maintenance on our streets includes sealcoating, crackfilling and small overlay projects. Street improvement projects to replace, overlay or rehabilitate aged and
<br />deteriorated streets, storm drainage, and adjacent walks will be completed every other year.
<br />2026 - Main Street reconstruction
<br />Justification
<br />Individual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street segment. These techniques
<br />may range from preventative maintenance to a full reconstruction of the surface and aggregate base. As they are implemented, the prescribed techniques will continually be
<br />gauged to assure their performance is proper in extending the life of our pavements.
<br />Expenditures 2026 2027 2028 2029 2030 Total
<br />Construction 1,000,000 6,000,000 0 3,500,000 0 10,500,000
<br />Maintenance 200,000 0 200,000 0 200,000 600,000
<br />Design 100,000 0 100,000 0 100,000 300,000
<br />Total 1,300,000 6,000,000 300,000 3,500,000 300,000 11,400,000
<br />Funding Sources 2026 2027 2028 2029 2030 Total
<br />Pavement Management 1,300,000 2,000,000 300,000 3,500,000 300,000 7,400,000
<br />Municipal State Aid 0 4,000,000 0 0 0 4,000,000
<br />Total 1,300,000 6,000,000 300,000 3,500,000 300,000 11,400,000
<br />Produced Using Plan-It CIP Software Page 356 of 379
|