My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda Packet November 17, 2025
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2025
>
11-17-2025
>
City Council Agenda Packet November 17, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 12:53:13 PM
Creation date
12/5/2025 12:47:37 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/17/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Construction Conditions <br />Site Preparation and Grading <br />Hardscape <br />Plantings / Landscaping <br />Lighting / Electrical <br />Furnishings <br />Special Features <br />Signage and Storytelling <br />Interactive Water Feature <br />Subtotal <br />Contingencies and OH&P*Estimated Construction Total <br />Estimated Construction Documentation, Bidding Support, & Construction <br />Administration Cost** <br />$14,420.00 <br />$13,671.00 <br />$66,042.50 <br />$23,546.80 <br />$19,525.00 <br />$38,578.75 <br />$60,000.00 <br />$65,440.00 <br />$301,224.05 <br />$121,865.99$423,090.04 <br />$40,000.00 to <br />$50,000.00 <br />PAGE 15 <br />Opinion of Probable Cost <br />Note: This opinion of probable construction cost is made on the basis of Mend Collaborative’s experience and comparable project cost <br />research. However, since Mend Collaborative has no control over the cost of labor, materials, equipment, or services furnished by others, <br />or over the Contractor’s methods of determining prices, or over competitive bidding or market conditions, Mend Collaborative cannot and <br />does not guarantee that proposals, bids, or actual construction cost will not vary from this opinion of probable construction cost. <br />*At this level of design, contingencies are estimated high - around 30%. This is done in effort to set <br />expectations for any fluctuations in construction industry changes in labor costs, materials costs, or <br />unforeseen circumstances. <br />** Estimated consulting fees for construction documentation includes the following specialties: <br />Landscape Architecture, MEP, Civil Engineering, and Cost Estimation. General consulting fee <br />estimation can be assumed around 12% of total construction cost. <br />Page 311 of 379
The URL can be used to link to this page
Your browser does not support the video tag.