My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMUSR 11-12-2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2025
>
11-12-2025
>
ERMUSR 11-12-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 9:46:50 AM
Creation date
12/3/2025 2:06:35 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Residential Electric Connection - Developer - Lot with ERMU water service 975.00$ <br />New Residential Electric Connection - Developer - Lot without ERMU water service 1,475.00$ <br />New Electric Connection - Standard 875.00$ 900.00$ 2.86% <br />New Electric Connection - Non Standard Loads (i.e seasonal cabin, RV panel, Billboards, electric fence, etc.)100% <br />New Wire Footages over 200' (per foot)5.00$ <br />New Service Frost Trenching (per foot)6.00$ <br />New Commercial & Industrial Electric Connection 50% <br />Service Upgrades or Additions for Existing Customers 100% <br />Minimum Temporary Electric Service Fee - Existing Transformer (standard)220.00$ 350.00$ 59.10% <br />Minimum Temporary Electric Service Fee - Without Existing Transformer (standard)850.00$ 1,000.00$ 17.65% <br />Non-Standard Temporary Electric Service - (Additional infrastructure needed to install service to customer)100% <br />Grid Access Fee 5.56$ <br />Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture 3,400.00$ <br />Street Light - 23' Decorative Pole with Cobra Fixture 2,400.00$ <br />Street Light - 14' Decorative Pole with Cobra Fixture 5,500.00$ <br />Street Light - 14' Decorative Pole with Acorn Fixture 7,500.00$ <br />Security Light - Wood Pole with Fixture 975.00$ 1,500.00$ 53.85% <br />Security Light - Existing Pole 350.00$ 600.00$ 71.43% <br />Pole Attachment Fee (per pole) 15.00$ <br />Meter Installation Fee (per individually metered apartment unit)25.00$ <br />Water Access Charge = Water Connection Charge + Water Availability Charge 3,990.00$ <br />Water Connection Charge (Per Plumbing Unit) - Builder 3,600.00$ <br />Water Availability Charge (Per Plumbing Unit) - Developer 390.00$ <br />Abandoned Water Service (minimum)6,000.00$ <br />Backflow Preventer Device Non-Compliance (per month)$100.00 <br />Deposit for 3/4" Hydrant Meter 175.00$ <br />Deposit for 2 1/2" Hydrant Meter 1,500.00$ <br />Hydrant Water Sales - Rental (per week)50.00$ <br />Hydrant Water Sales - Units (per 1000 gallons)4.20$ <br />Hydrant Wrench 40.00$ <br />Private Hydrant Maintenance Program Monthly Fee 5.00$ <br />Administrative Fee for Continued Submission of Checks After No-Check Notice Given 20.00$ <br />Administrative Fee for Continued Submission of Payment After Account Closed 20.00$ <br />Billable Cost of Materials Markup 15% <br />Billable Labor Markup 58% <br />Billable Vehicle / Equipment (per employee per hour)50.00$ <br />Commercial Application Fee 20.00$ <br />Electric Service Disconnect/Trip Fee - Meter Technician 50.00$ <br />Electric Service Disconnect/Trip Fee - Line Crew 150.00$ <br />Water Service Disconnect/Trip Fee - Water Operator 100.00$ <br />Manual Meter Reading Fee (per month)50.00$ <br />Additional Manual Meter Reading Fee (per month) 10.00$ <br />Meter Tampering Fee 250.00$ <br />Meter Testing Fee 50.00$ <br />NSF Fee 30.00$ <br />Penalty Amount 10% <br />Photocopies (per page)0.25$ <br />Red Tag Handling Fee 20.00$ <br />Proposed Increase <br />Proposed 2026 Utilities Fee Schedule <br />ELECTRIC <br />WATER <br />ADMINISTRATIVE <br />Fee Description 2025 <br />Elk River Municipal Utilities <br />Proposed 2026 <br />102
The URL can be used to link to this page
Your browser does not support the video tag.