Laserfiche WebLink
Price difference if <br />we did not finish <br />spaces and what <br />the future cost <br />would be <br />compared to <br />savings. <br />Savings and <br />projected costs in <br />future <br />Office Space Savings <br />Cost in <br />Future <br />    <br />Police Office $19,000 <br />  <br />5% - 6% each <br />year <br />Relief Assoc.$14,000   <br />Fire Offices $15,000 each   <br />Classroom $630,000 - <br />$750,000 <br />  <br />1 suite: 2 bedrooms, 1 <br />bathroom, lockers <br />$51,000 - <br />$61,000 <br />  <br />Page 166 of 322