Laserfiche WebLink
<br />§ B.2.3.3 Insurance for Existing Structures <br />If the Work involves remodeling an existing structure or constructing an addition to an existing structure, the Owner shall <br />purchase and maintain, until the expiration of the period for correction of Work as set forth in Section 12.2.2 of the General <br /> Conditions, “all-risks” property insurance, on a replacement cost basis, protecting the existing structure against direct physical <br />loss or damage from the causes of loss identified in Section B.2.3.1, notwithstanding the undertaking of the Work. The Owner <br />shall be responsible for all co-insurance penalties. <br />§ B.2.4 Optional Extended Property Insurance. <br />The Owner shall purchase and maintain the insurance selected and described below. <br />(Select the types of insurance the Owner is required to purchase and maintain by placing an X in the box(es) next to the <br />description(s) of selected insurance. For each type of insurance selected, indicate applicable limits of coverage or other <br />conditions in the fill point below the selected item.) <br />\[ \] § B.2.4.1 Loss of Use, Business Interruption, and Delay in Completion Insurance, to reimburse the Owner for <br /> loss of use of the Owner’s property, or the inability to conduct normal operations due to a covered cause of <br />loss. <br /> <br />\[ \] § B.2.4.2 Ordinance or Law Insurance, for the reasonable and necessary costs to satisfy the minimum <br />requirements of the enforcement of any law or ordinance regulating the demolition, construction, repair, <br />replacement or use of the Project. <br /> <br />\[ \] § B.2.4.3 Expediting Cost Insurance, for the reasonable and necessary costs for the temporary repair of <br />damage to insured property, and to expedite the permanent repair or replacement of the damaged property. <br /> <br />\[ \] § B.2.4.4 Extra Expense Insurance, to provide reimbursement of the reasonable and necessary excess costs <br />incurred during the period of restoration or repair of the damaged property that are over and above the total <br />costs that would normally have been incurred during the same period of time had no loss or damage occurred. <br /> <br />\[ \] § B.2.4.5 Civil Authority Insurance, for losses or costs arising from an order of a civil authority prohibiting <br />access to the Project, provided such order is the direct result of physical damage covered under the required <br />property insurance. <br /> <br />\[ \] § B.2.4.6 Ingress/Egress Insurance , for loss due to the necessary interruption of the insured’s business due <br />to physical prevention of ingress to, or egress from, the Project as a direct result of physical damage. <br /> <br />\[ \] § B.2.4.7 Soft Costs Insurance, to reimburse the Owner for costs due to the delay of completion of the <br />Work, arising out of physical loss or damage covered by the required property insurance: including <br />construction loan fees; leasing and marketing expenses; additional fees, including those of architects, <br />engineers, consultants, attorneys and accountants, needed for the completion of the construction, repairs, or <br />reconstruction; and carrying costs such as property taxes, building permits, additional interest on loans, realty <br />taxes, and insurance premiums over and above normal expenses. <br /> AIA Document A133 – 2019 Exhibit B. Copyright © 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the <br /> AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:43:24 CDT on 10/16/2025 under <br />3 <br />Subscription No.20250122412 which expires on , is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract <br />® <br />Documents Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (640e2aeff442e4498d0968b0) <br />