My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Packet - September 23, 2025
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2025
>
09-23-2025
>
Planning Commission Packet - September 23, 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 8:48:11 AM
Creation date
9/24/2025 8:47:20 AM
Metadata
Fields
Template:
City Government
date
9/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETAILSd/>^ϴ10:09 PMN:\Projects Current\24-0290.00 Briggs ER Plat #2\Civil\CAD Files\CoverSWPPPDetails.dwg9/18/2025DESCRIPTIONDATENO.REVFILE NO.: DWG FILE: CHECKED BY: DRAWN BY: DESIGN BY: DATE: ^,dEK͘LAND SURVEYINGCIVIL ENGINEERINGENVIRONMENTAL SERVICES13076 FIRST STREET, BECKER, MN 55308-9322TEL: 763-262-8822 FAX: 763-262-8844BOGART, PEDERSON& ASSOCIATES, INC.Z/''^><Z/sZW>dŝƚLJŽĨůŬZŝǀĞƌ͕^ŚĞƌďƵƌŶĞŽƵŶƚLJ͕DE09/17/202524-0290.00CJDDMLMJMEKd&KZKE^dZhd/KEREVE1. THE SEDIMENT LOGS SHALL BE TRENCHED 4" INTO THE GROUND ANDSHALL BE STAKED BY STEEL FENCE POSTS OR 2"X 2" WOOD STAKES.2. SOIL SHALL BE COMPACTED ON THE UPSLOPE SIDE OF LOGS.12"10" DIA. SEDIMENT LOGCOMPACTED SOIL TOPREVENT PIPINGSEDIMENT-LADEN RUNOFFSTAKED AND ENTRENCHED 10" DIA.SEDIMENT LOGFILTERED RUNOFFEROSION CONTROLBLANKETSEDIMENT FILTER LOG INSTALLATIONN.T.S.Page 44 of 82
The URL can be used to link to this page
Your browser does not support the video tag.