Laserfiche WebLink
WLWL <br />WL WLWLWLWLWLWLWLWLWLWL <br />WLWLWLWLWLWLWLWLWLWLWLWLWLWWLWLWLWLWLWLWLWLWL WL <br />WL4-STORY APARTMENT BUILDING A <br />24,024 S.F. (15.7%) <br />(79 UNITS TOTAL) <br />(FIRST FLOOR PARKING) <br />WLWLWL4-STORY APARTMENT BUILDING B <br />24,024 S.F. (15.7%) <br />(79 UNITS TOTAL) <br />(FIRST FLOOR PARKING)WLWLWLWLWLWLWVVVV889.5889.0888.5VV <br />VV <br />VVVVVVVV 889.5889.0888.5VVVVVVVVVVVV <br />VV <br />VV <br />VV <br />VV <br />VV <br />VV <br />VV <br />VV <br />VV <br />883884885886887888889883884885886887888889884885886887888889884885886887888889885886887888889888 <br />888889889888889889889891892893894VV880880881881882882883883884884885886887SVVSV <br />V <br />SVV <br />V <br />V <br />V <br />V <br />V <br />V <br />V <br />VVV|||||DVVVVVVVVVV VVVV||||||||889890891892892891890889887886886888EOF=886.75SFSFSFWLLLLLSFSFSFSFSFSFSFSFINSTALL 116 LF OF TEMP. SILT FENCEINSTALL 19 LF OF TEMP. SILT FENCEINSTALL 124 LF OF TEMP. SILT FENCEINSTALL 107 LF OF TEMP. SILT FENCEINSTALL TEMPORARY SEDIMENT FILTERINSTALL TEMPORARY SEDIMENT FILTERINSTALL TEMPORARY SEDIMENT FILTERINSTALL TEMPORARY SEDIMENT FILTERINSTALL TEMPORARYSEDIMENT FILTER (EA)INSTALL TEMPORARY SEDIMENT FILTER (EA)INSTALL TEMPORARY SEDIMENT FILTERINSTALL TEMPORARY SEDIMENT FILTERINSTALL TEMPORARY SEDIMENT FILTERINSTALL TEMPORARYSEDIMENT FILTER (EA)INSTALL TEMPORARYSEDIMENT FILTER (EA)INSTALL 10 LF OF TEMP. SEDIMENT LOGINSTALL 6 LF OF TEMP. SEDIMENT LOGINSTALL 6 LF OF TEMP. SEDIMENT LOGINSTALL 28 LF OF TEMP. SEDIMENT LOGPLACE 11 CY OF RIP RAP CL IVPLACE 10 CY OF RIP RAP CL IVPLACE 8 CY OF RIP RAP CL IIIINSTALL ROCK CONSTRUCTION ENTRANCE/EXITPLACE 1,639 SY OF EROSION CONTROL BLANKETPLACE ±1.71 AC OF SEEDINGPLACE ±1.71 AC OF SEEDINGPLACE ±1.71 AC OF SEEDINGPLACE ±1.71 AC OF SEEDINGPLACE ±1.71 AC OF SEEDINGPLACE ±1.71 AC OF SEEDINGSF SFSFSFSFSFSFSF <br />SFSFSFSFSFSFSFSFSF <br />SFSFSFSFSFSF SF SFSFSFSFINSTALL 10 LF OF TEMP. SEDIMENT LOGSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF <br />SF <br />SFSFSFSFSF <br />INSTALL 94 LF OF TEMP. SILT FENCEINSTALL 77 LF OF TEMP. SILT FENCEINSTALL 1477 LF OF TEMP. SILT FENCEINSTALL 1477 LF OF TEMP. SILT FENCEINSTALL 1477 LF OF TEMP. SILT FENCEINSTALL 6 LF OF TEMP. SEDIMENT LOGPLACE 587 SY OF EROSION CONTROL BLANKETINSTALL TEMPORARY SEDIMENT FILTERINSTALL 478 LF OF TEMP. SILT FENCEINSTALL 403 LF OF TEMP. SILT FENCEWLWLLLWLWLLLPLACE 10 CY OF RIP RAP CL IVINSTALL TEMPORARY SEDIMENT FILTERSFSFSFSFSFSFSFSFSFSFSFINSTALL 358 LF OF TEMP. SILT FENCEINSTALL TEMPORARYSEDIMENT FILTER (EA)PLACE ±0.02 AC OF SEEDINGPLACE ±0.002 AC OF SEEDINGINSTALL 6 LF OF TEMP. SILT FENCEINSTALL TEMPORARY SEDIMENT FILTERINSTALL 559 LF OF TEMP. SEDIMENT LOGEROSIONZK^/KEKEdZK>W>Eϱ10:08 PMN:\Projects Current\24-0290.00 Briggs ER Plat #2\Civil\CAD Files\Erosion Control.dwg9/18/2025SFGRADING LIMITS AND PROPOSEDTEMPORARY SILT FENCETEMPORARY ROCK CONSTRUCTION ENTRANCEPROPOSED RIP RAPPROPOSED CONTOUREROSION CONTROL BLANKET (CAT. 20)EMERGENCY OVERFLOWE.O.F.TEMPORARY SEDIMENT FILTER- HIGH FLOW>'E͗FIBER-LOG ROLLSZK^/KEKEdZK>EKd^͗1. CONTRACTOR SHALL CONFINE CONSTRUCTION OPERATIONS TO THECONSTRUCTION/GRADING LIMITS SHOWN.2. ALL WORK SHALL CONFORM TO THE MINNESOTA POLLUTION CONTROL AGENCY'SSTORM WATER PERMIT REQUIREMENTS. CONTRACTOR SHALL OBTAIN ALL PERMITSAND COMPLY WITH ALL PERMIT REQUIREMENTS.3. THE SITE SOIL EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE INSTALLEDPRIOR TO ANY DEMOLITION OR GRADING OPERATIONS AND MAINTAINED TO CONFORMWITH THE STANDARDS SPECIFIED BY THE PERMIT.4. CONTRACTOR SHALL INSPECT TEMPORARY EROSION CONTROL MEASURES ON THEENTIRE SITE AT LEAST EVERY 7 DAYS AND WITHIN 24 HOURS OF ANY MEASURABLERAINSTORM. DAMAGED SILT FENCE OR OTHER EROSION CONTROL DEVICES ORPRACTICES SHALL BE REPAIRED IMMEDIATELY. INSPECTION AND MAINTENANCE OFDEVICES SHALL CONTINUE UNTIL THE SITE HAS UNDERGONE FINAL STABILIZATIONAND A NOTICE OF TERMINATION IS SUBMITTED TO THE MPCA.5. ALL GRADING OPERATIONS SHALL BE CONDUCTED IN A MANNER TO MINIMIZE THEPOTENTIAL FOR SITE EROSION.6. THE SITE SOIL EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE INSTALLEDAND MAINTAINED TO CONFORM WITH THE STANDARDS SPECIFIED BY THE CITY OF ELKRIVER AND THE MPCA.7. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO THE DISTURBANCE OFANY AREAS AND MAINTAINED UNTIL ALL TRIBUTARY DISTURBED AREAS ARERESTORED.8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL EROSIONCONTROL MEASURES, INCLUDING SILT FENCE AND BALES, UPON ESTABLISHMENT OFPERMANENT VEGETATION IN SAID AREAS.9. ALL SOILS TRACKED ONTO PAVEMENT OR ANY OTHER OFF-SITE AREA SHALL BEREMOVED DAILY.10. THE SITE SEDIMENT CONTROL FACILITIES FOR THE PROJECT MUST BE INSTALLEDPRIOR TO ANY GRADING OPERATION.11. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED ANDVEGETATED AS SOON AS POSSIBLE. ANY FINISHED AREAS SHALL BE SEEDED ANDMULCHED WITHIN 7 DAYS AFTER FINISHED GRADING IS COMPLETED IN ACCORDANCETO MN/DOT 2575.12. ALL DISTURBED AREAS SHALL BE REVEGETATED WITH MN/DOT SEED MIX, MULCHED,FERTILIZED & DISK ANCHORED, PER THE FOLLOWING SCHEDULE:STANDARD SEED MIX 25-131: 220 LB/AC.INFILTRATION BASIN SEED MIX 33-261: 35 LB/AC.FERTILIZER 22-5-10: 350 LB/AC.MULCH TYPE 3: 2 TONS/AC.13. CONTRACTOR SHALL INSTALL TEMPORARY SEDIMENT BMP'S SHOWN AND NOT SHOWNON PLANS DURING PHASING ON PROJECT TO COMPLY WITH MPCA, CITY INSPECTORAND DEVELOPER REQUEST.WWZKy/DdZK^/KEKEdZK>s/^xSILT FENCE: 3,282 LFxBIOLOG: 625 LFxROCK CONSTRUCTION: 1 EACHxEROSION CONTROL BLANKET (CAT. 20): 2,229 S.Y.xRIP RAP (CLASS III) 8 C.Y.xRIP RAP (CLASS IV) 31 C.Y.SCALE:0' 30' 60'1"=30'DESCRIPTIONDATENO.REVFILE NO.: DWG FILE: CHECKED BY: DRAWN BY: DESIGN BY: DATE: ^,dEK͘LAND SURVEYINGCIVIL ENGINEERINGENVIRONMENTAL SERVICES13076 FIRST STREET, BECKER, MN 55308-9322TEL: 763-262-8822 FAX: 763-262-8844BOGART, PEDERSON& ASSOCIATES, INC.Z/''^><Z/sZW>dŝƚLJŽĨůŬZŝǀĞƌ͕^ŚĞƌďƵƌŶĞŽƵŶƚLJ͕DE09/17/202524-0290.00CJDDMLMJMEKd&KZKE^dZhd/KEPage 41 of 82