Laserfiche WebLink
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Thomas Geiser — Operations Director <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />August 12, 2025 <br />6.1e <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Working through the second round of maps for the new GIS mapping system that we <br />plan to move forward with in the future. Maps 1 through 71 are complete. <br />• Still working through the lack of communication and action regarding the reclosers that <br />were recalled. We continue to wait for our 30 units to be repaired. <br />• Staff and I are working through ERMU's Disaster Recovery Plan. <br />• Staff and I are working through ERMU's spill prevention plan at all substation locations <br />with DGR Engineering. <br />• Staff and I are working on ERMU's substation and well security measures that includes <br />sitting in on vendor demos. <br />• Working with Minnesota Municipal Power Agency on their landfill gas project which is <br />on hold for now. <br />• Working through future development plans. <br />• Working with Altec on Digger #9 and Bucket #5 drawings. <br />• Working with Leidos on Verizon pole attachment reviews. <br />• Working with staff on RP3 application that is due by September 30. <br />• Working with DGR Engineering on ERMU's fuse and fault current coordination study <br />along with future system study. <br />Page 1 of 1 <br />139 <br />